Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mp Rbc Ap 2023 24 Urgent Repair Work To Kavilpad Bc At Tailend Ch 7/00 Km For 2023 24 Second Crop And 2024 F C Gcw
|
| Description |
The Tailend Portion Of The Kalivpad Branch&Amp#X0d
Canal Is Mostly Water Logged, So Wetness Exist&Amp#X0d
In The Canal. The Foundation Earth Is Marshy&Amp#X0d
Bulky Soil, Thus Quarry Muck Is Provided In The&Amp#X0d
Estimate As Bed Firming Is Required.
|
| Organisation | Irrigation Department | State Govt. and UT |
| Tender Id | 2024_Irrig_649631_1 |
|
Reference Number |
IRR/PI/TR/7934/2023_5_1_1/1 |
| Tender Fee | 750 |
| EMD | 8470 |
| Tender Value | - |
| Place | Kavilppad |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=997756 |
| Start Date | January 25, 2024 17:20 |
| End Date |
Expired
03/02/2024
Expired 982 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General mp rbc ap-2023-24-urgent repair work to kavilpad bc from ch 3/330 km to 3/650 km neelikadu-aalangod for 2023-24 sc and 2024 fc- gcw
The kavilpad branch canal from ch.3/300 km&#x0d to 3/650 km is mostly damaged and broken&#x0d which has to be demolished and urgent repair&#x0d works in the form of concrete walls are to be&#x0d provided in this portion of the canal. hence, the&#x0d work is proposed.
Read moreGeneral-mp-rbc-ap-2023-24 - urgent repair work to pudupariyaram branch canal near starting point for 2023-24 second crop and 2024 first crop-general civil work
The initial portion of the puduppariyaram&#x0d branch canal offtaking from rb main canal at&#x0d ch. 6/000 km is damaged and needs urgent&#x0d repair. the work is proposed to make the&#x0d ing portion leak proof and to enable better&#x0d flow of water to the tail
Read moreGeneral-mp-rbc -ap-2023-24-am-urgent desilting and removal of vegetative materials from pathirippala branch canal for 2023-24 second crop and 2024 first crop- general civil work
Cleaning of pathiripala branch canal for second, first crops and as and when required clearing and desilting manmazdoor
Read moreGeneral-mp-rbc-ap- 2023-24-am-urgent desilting and removal of vegetative materials from mankara branch canal for 2023-24 second crop and 2024 first crop -general civil work
Cleaning of mankara branch canal for second crop, first crop and as and when required,clearing,desilting,amanmazdoor etc
Read moreGeneral - mp rbc- ap _ 2023-24-am -urgent desilting and removal of vegetative materials from thenur branch canal for 2023-24 second crop and 2024 first crop-general civil work
Clearing jungls ,desilting,manmazdoor veytc
Read moreGeneral-mp-rbc- ap-2023-24-am-urgent desilting and removal of vegetative materials from kinavallur branch canal for 2023-24 second crop and 2024 first crop-general civil work
Clearing,desilting,engaging mazdoor
Read moreGeneral-mp-rbc-ap-2023-24-am- urgent desilting and removal of vegetative materials from kinavallur branch canal for 2023-24 second crop and 2024 first crop-general civil work
Work includes cleaning of kinavallur branch canal for 2023-24 second crop and 2024 first cropmankara, pathirippala, palappuram branch canals and minor distributorys and field canals
Read moreGeneral mp rbc ap 2023 24 annual maintenance urgent desilting removal of vegitation vegitative material from rbmc between ch 0 000km to 10_000km.and including kavilpad branch and pudupariyaram branch canal for 2023 24 second crop and 2024 first c
Clearing grass earth work exacavation
Read moreGeneral-mp-rbc-ap-2023-24- annual maintenance-urgent desilting and removal of vegetative material from vallikode ii branch canal for 2023-24 second crop and 2024 first crop-general civil work
Cleaning of vallikkode ii branch canal for second crop, first crop and as and when required
Read moreGeneral-mp-rbc-ap-2023-24- annual maintenance-urgent desilting and removal of vegetative material from vallikode i branch canal for 2023-24 second crop and 2024 first crop-general civil work
Cleaning of vallikkode i branch canal for second, first crops and as and when required
Read moreof your Industry type