Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Konica Dry Films For Dry Camera Size 8x10
|
| Description |
Konica Dry Films For Dry Camera Size 8x10
|
| Organisation | Municipal Corporation of Greater Mumbai | State Govt. and UT |
| Tender Id | 2026_MCGM_1292571_1 |
|
Reference Number |
KEM/GST/23 |
| Tender Fee | 927 |
| EMD | 6000 |
| Tender Value | - |
| Place | General Store Kem Hospital Parel |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2221479 |
| Start Date | April 08, 2026 21:30 |
| End Date |
Expired
15/04/2026
Expired 138 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
E tender for supply of ct and cr films to radiology dept of hims hassan
E tender for supply of ct and cr films to radiology dept of hims hassan
Read moreDry dock repair of fjb-ii, fjb-ix and fjb-xiii for the year 2026-27
Dry dock repair of fjb-ii, fjb-ix and fjb-xiii for the year 2026-27
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Read moreDesign, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Read moreRoutine, breakdown maintenance and assistance for operation of pumps and compressors of dust extraction, dust suppression, dry fog dust suppression and tunnel ventilation system of chp unit no3
Routine, breakdown maintenance and assistance for operation of pumps and compressors of dust extraction, dust suppression, dry fog dust suppression and tunnel ventilation system of chp unit no 3
Read moreAdvance pitting work at rampura sy no, 68 for 25 ha and raising of 10x16 size seedlings in kushtagi range during 2026-27
Advance pitting work at rampura sy no, 68 for 25 ha and raising of 10x16 size seedlings in kushtagi range during 2026-27
Read moreRoutine collection, loading, transportation and unloading of mill rejects, coal (dry or wet), clearing of coal from feeder floor during calibration of mill, hfo unloading and miscellaneous works of unit 1,2 & 3 for a period of one year
Routine collection, loading, transportation and unloading of mill rejects, coal (dry or wet), clearing of coal from feeder floor during calibration of mill, hfo unloading and miscellaneous works of unit 1,2 & 3 for a period of one year
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreof your Industry type