Tender Details

Particulars Details
Title
Laying Of Cc Drains And Roads From 14 A Transformer To 251 Sachivalayam At Simhagiri Colony In Ward No. 45 (Hillock Area)
Description
Laying Of Cc Drains And Roads From 14 A Transformer To 251 Sachivalayam At Simhagiri Colony In Ward No. 45 (Hillock Area) (3rd Call)
Organisation Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 503
EMD 14200
Tender Value
Place AP
Link

AAAAAAAAAA

Login to view
Start Date June 20, 2025 19:30
End Date

30/06/2025 ( 0 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu

Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu

Read more
Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).

Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of cc road at ward no 24sukhlal lodhi house to kudra tola and jeewan kachi house to ravi lodhi and dinesh pandit house to shankar mandir and behind mahendra singh house to talaab.

Construction of cc road at ward no 24sukhlal lodhi house to kudra tola and jeewan kachi house to ravi lodhi and dinesh pandit house to shankar mandir and behind mahendra singh house to talab.

Read more
Asphlting of road from behind putlighar infront pir sahab gali to dr. yusuf khalil house in ward no.09, zone no.05

Asphlting of road from behind putlighar infront pir sahab gali to dr. yusuf khalil house in ward no.09, zone no.05

Read more
Asphlting of road from putlighar chauraha to masjid fakhruddin and various places in ward no.09, zone no.05

Asphlting of road from putlighar chauraha to masjid fakhruddin and various places in ward no.09, zone no.05

Read more
Construction of wbm road from pulander gurjar to nigam colony muktidham at ward 17

Construction of wbm road from pulander gurjar to nigam colony muktidham at ward 17

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise