Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Works Related To Maintenance, Necessary Line Shifting, Extensions And Upgradation Of Existing 6.6 K V Feeders Emanating From Hingula 33 K V/6.6 K V Substation For A Period Of 730 Days.
|
| Description |
Works Related To Maintenance, Necessary Line Shifting, Extensions And Upgradation Of Existing 6.6 K V Feeders Emanating From Hingula 33 K V/6.6 K V Substation For A Period Of 730 Days.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_MCL_281575_1 |
|
Reference Number |
MCL/GM/HA/EnM/ e-Tender/23-24/33 Dt.15.06.23 |
| Tender Fee | |
| EMD | 97600 |
| Tender Value | |
| Place | OFFICE OF STAFF OFFICER (ENM), HINGULA AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | June 16, 2023 15:30 |
| End Date |
Expired
03/07/2023
Expired 1080 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of control room building and other civil works for new 33/11 kv substation sitla sarai distt. amroha
Construction of control room building and other civil works for new 33/11 kv substation sitla sarai distt. amroha
Read moreCgm(d)/apdcl/uar/t 233/oil-moran/2025-26/9
1.shifting and con of existing 33 kv overhead sepon and demow feeder to underground cable line for 33 kv bay extension at 132/33 kv moran gss under moran esd 2.construction of 33 kv mvcc line from moran 132/33kv gss to moran oil
Read moreProvision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Read moreCleaning of existing road gullies and manhole/ inspection chamber for swd from junction no. 3 to junction no. 33 u.t., chandigarh under sde sew-1, chandigarh (for the period of 03 months) (ch. to 2215 (n.p) urban water supply)
Cleaning of existing road gullies and manhole/ inspection chamber for swd from junction no. 3 to junction no. 33 u.t., chandigarh under sde sew-1, chandigarh (for the period of 03 months) (ch. to 2215 (n.p) urban water supply)
Read moreSupply and supervision of installation, testing and commissioning of 01 no. 33 kv protection panel for 220/132kv sitarganj substation of powergrid
Procurement of 01 no. 33 kv protection panel for transformer-(with automation) for control and protection purpose of to be commissioned tertiary bay for utilization of tertiary winding of 220/132/33kv m/s toshiba make 160 mva transformer at 220/132kv sitarganj substation of powergrid nr-iii region
Read moreRepair and maintenance of security lights provinding and replacement of existing faulty underground 240 mm 3.5 sqmm cable line from sub -station-1 to mt via barracks and sos mess and 120 mm 3.5 sqmm cable line fromsub -station-2 to shopping comple
Repair and maintenance of security lights provinding and replacement of existing faulty underground 240 mm 3.5 sqmm cable line from sub -station-1 to mt via barracks and sos mess and 120 mm 3.5 sqmm cable line fromsub -station-2 to shopping comple
Read moreAnnual maintenance and upkeeping of archaeological gardens under aizawl circle, aizawl (in the states of tripura and manipur) for the period from july, 2026 to march, 2027 during the financial year 2026-27
Annual maintenance and upkeeping of archaeological gardens under aizawl circle, aizawl (in the states of tripura and manipur) for the period from july 2026 to march 2027 during the financial year 2026-27
Read moreMaintenance, necessary line shifting, extensions and upgradation of existing/upcoming 6.6 kv feeders emanating from hingula 33 kv/6.6 kv substation for a period of 730 days.
Maintenance, necessary line shifting, extensions and upgradation of existing/upcoming 6.6 kv feeders emanating from hingula 33 kv/6.6 kv substation for a period of 730 days.
Read moreWorks related to 33 kv overhead power supply line from nandira 132 kv s/s to hingula 33 kv/6.6 kv s/s maintenance, maintenance inside substation premises and manpower supply for a period of 365 days.
Works related to 33 kv overhead power supply line from nandira 132 kv s/s to hingula 33 kv/6.6 kv s/s maintenance, maintenance inside substation premises and manpower supply for a period of 365 days.
Read moreAmc for 33 kv overhead line drawn from 132 kv /33 kv nandira substation to 33 kv/3.3kv and 33 kv/6.6 kv/3.3kv substations of ananta ocp for a period of 730 days.
Amc for 33 kv overhead line drawn from 132 kv /33 kv nandira substation to 33 kv/3.3kv and 33 kv/6.6 kv/3.3kv substations of ananta ocp for a period of 730 days.
Read moreof your Industry type