Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Execution For Works For Construction Of Box Type Rob On Nh 930, Including Casting And Pushing Of Rcc Box Bridge, Retaining Wall/Toe Wall For Box Bridge And Other Allied Works In Connection With Provision Of Additional Loop Line (Line No 3) And Chordline Connection From Chandrapur To Chandafort (Line No 4) At Chanda Fort Yard Of Nagpur Division Of S.E.C.Railway.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73047581 |
|
Reference Number |
CPM-GSU-22-NGP-2023-24 |
| Tender Fee | 0 |
| EMD | 7.07 Lakh |
| Tender Value | - |
| Place | Bilaspur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/022024/73047581/viewNitPdf_4451666.pdf |
| Start Date | January 30, 2024 21:49 |
| End Date |
Expired
23/02/2024
Expired 965 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ohe modification works with 2x25 kv traction in connection with yard remodelling of talodhi, rajori, mul-maroda, kelzar and chanda ford station in connection with gondia-chandafort doubling project in nagpur division of s.e.c. railway.
Ohe modification works with 2x25 kv traction in connection with yard remodelling of talodhi, rajori, mul-maroda, kelzar and chanda ford station in connection with gondia-chandafort doubling project in nagpur division of s.e.c. railway.
Read moreConstruction of bridge by box pushing method under running track, and other allied works between new kanpur to new bhaupur section dfc chainage 462 km to 507.670 km, under jurisdiction of cgm/pryj
Construction of bridge by box pushing method under running track, and other allied works between new kanpur to new bhaupur section dfc chainage 462 km to 507.670 km, under jurisdiction of cgm/pryj
Read moreRe-building of existing bridge no. 52( 1x2.44m fc slab) at km 511/11-13 between karauta and khusropur stations by new 1x3.0mx2.5m clear span rcc box bridge by pushing method under sr.den/2/dnr section on main line of danapur division.
Re-building of existing bridge no. 52( 1x2.44m fc slab) at km 511/11-13 between karauta and khusropur stations by new 1x3.0mx2.5m clear span rcc box bridge by pushing method under sr.den/2/dnr section on main line of danapur division.
Read moreSr. den(e)bsl- proposed construction of lhs(by box pushing method using r.h. girder) in lieu of level crossing no.24 at kms. 535/16-18 on jalamb-shegaon section. (in connection of pwd jalamb rob, deposit work pwd, khamgaon)
Sr. den(e)bsl- proposed construction of lhs(by box pushing method using r.h. girder) in lieu of level crossing no.24 at kms. 535/16-18 on jalamb-shegaon section. (in connection of pwd jalamb rob, deposit work pwd, khamgaon)
Read more(1) provision of standard cantilever arrangement on platforms in mys and cta depots jurisdiction.(2) ohe modification in connection with proposed construction of road under bridge (rcc box with opening of size 1x7.5mx5m) in lieu of lc no.72 at km 122/500-600 between bsn-rdi stations. (launching by crane method) bridge no.119
(1) provision of standard cantilever arrangement on platforms in mys and cta depots jurisdiction.(2) ohe modification in connection with proposed construction of road under bridge (rcc box with opening of size 1x7.5mx5m) in lieu of lc no.72 at km 122/500-600 between bsn-rdi stations. (launching by crane method) bridge no.119
Read moreExecution of formation, construction of new platform, ei building, supply of ballast, transportation of p.way materials, linking of track and other allied miscellaneous works in connection with provision of additional loop line (line no 3) and chordline connection from chandrapur to chandafort (line no-4) at chandafort yard of nagpur division of s.e.c.railway.
For complete deion and other details, please refer to tender
Read moreReplacement of non-standard pipe and stone slab bridge by rcc box and pipe pushing in cni-asn and dma-moh section by box pushing method in adra division of s.e.railway.
For complete deion and other details, please refer to tender
Read moreConstruction of a new rub (rail under bridge) by box pushing technique in connection with construction of independent up line for movement of trains to mechanical handling plants of ppa
Construction of a new rub (rail under bridge) by box pushing technique in connection with construction of independent up line for movement of trains to mechanical handling plants of ppa
Read moreBina-bhopal section - replacement of existing girder bridge no. 930/1 mid and down at km. 930/5-7 by rcc twin box (span 1/12.20 m, total 2 span)
For complete deion and other details, please refer to tender
Read moreConstruction of rcc box for railway crossing at rd 44.40 km. of ghodazari branch canal.(br no-221-a at km 1165/3-4 between alewahi-sindewahi stations on gondia-chandafort section (bg) by pushing method)
Construction of rcc box for railway crossing at rd 44.40 km. of ghodazari branch canal.(br no-221-a at km 1165/3-4 between alewahi-sindewahi stations on gondia-chandafort section (bg) by pushing method)
Read moreof your Industry type