Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Rcc Box For Railway Crossing At Rd 44.40 Km. Of Ghodazari Branch Canal.(Br No 221 A At Km 1165/3 4 Between Alewahi Sindewahi Stations On Gondia Chandafort Section (Bg) By Pushing Method)
|
Description |
Construction Of Rcc Box For Railway Crossing At Rd 44.40 Km. Of Ghodazari Branch Canal.(Br No 221 A At Km 1165/3 4 Between Alewahi Sindewahi Stations On Gondia Chandafort Section (Bg) By Pushing Method)
|
Organisation | Government of Maharashtra |
Tender Id | 2023_CEWRD_932846_1 |
Reference Number |
E tender Notice No 2 /2023-24 |
Tender Fee | 2360 |
EMD | 4.68 Lakh |
Tender Value | |
Place | Nagbhid |
Link | https://mahatenders.gov.in |
Start Date | August 07, 2023 17:30 |
End Date |
26/08/2023 ( Expired 604 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Construction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Read moreOpen e-tender for construction of limited height subway by box pushing method in lieu of level crossing gate no 62 between gour malda- malda stations in malda - new farakka section under the jurisdiction of assistant engineer/malda under sr. divisional engineer-i/eastern railway malda of malda division.
For complete deion and other details, please refer to tender
Read moreLaying and pushing 610 mm dia pipe fe-410 grade ms pipe crossing by adopting trenchless technologies (e.g. jack pushing method etc.) of 250mm rising main line for amritnagar zone-ii water supply scheme between station nimcha raniganj at km 197/21b-23
Laying and pushing 610 mm dia pipe fe-410 grade ms pipe crossing by adopting trenchless technologies (e.g. jack pushing method etc.) of 250mm rising main line for amritnagar zone-ii water supply scheme between station nimcha raniganj at km 197/21b-23
Read moreConstruction of canal bridge (rcc twin box 2 x 4.25m x 4m) as deposit work at canal chainage km 51.400 main canal of pkg no 16 in kaleshwaram project crossing/intersecting nh 163 at km 51/520 by open cut method along with provision of di roads
Construction of canal bridge (rcc twin box 2 x 4.25m x 4m) as deposit work at canal chainage km 51.400 main canal of pkg no 16 in kaleshwaram project crossing/intersecting nh 163 at km 51/520 by open cut method along with provision of di roads
Read moreBalance work of construction of proposed 4 lane rob and its approaches in lieu of existing level crossing no.124e/spl3 at km 1.800 on nh 205 between prasannayapalle n zangalapalle railway stations on anantapur dharmavaram railway section in the stat
Balance work of construction of proposed 4 lane rob and its approaches in lieu of existing level crossing no.124e/spl3 at km 1.800 on nh 205 between prasannayapalle n zangalapalle railway stations on anantapur dharmavaram railway section in the stat
Read moreConstruction of limited height sub way near at lc 50 at ir km 65 5 6 between sangariya dhaban railway station hanumangarh bhatinda section span 1 x 5 5 x 3 60m precast rcc box
Construction of limited height sub way near at lc 50 at ir km 65 5 6 between sangariya dhaban railway station hanumangarh bhatinda section span 1 x 5 5 x 3 60m precast rcc box
Read moreBalance works for construction of gosikhurd project right bank canal crossing 1 x 8.1m x 4.45 m r.c.c box at rly km 1126/9 10 between bramhapuri nagbhir station on gondia chanda fort section b.g by box pushing method
Balance works for construction of gosikhurd project right bank canal crossing 1 x 8.1m x 4.45 m r.c.c box at rly km 1126/9 10 between bramhapuri nagbhir station on gondia chanda fort section b.g by box pushing method
Read moreSupply, installation, testing and commissioning of telecom material in connection with (1) metro rail over bridge obligatory span p11-p12 at metro rail ch: 25766.50 & railway km. 72/01 & 72/03 between laxmibai nagar to mangliya railway stations. (2) godhara-nagda section:- providing subway at km 559/02-04 by air pushing method for between bordi-anas. (3) ratlam-godhara section:- construction of rub at km 522/08-10 (5.5 m x 4.5 m rcc box) on deposit basis.
For complete deion and other details, please refer to tender
Read moreRestoration of canal section by way of raising in concrete of tanda branch between rd 4250-4675 mtr at places
Restoration of canal section by way of raising in concrete of tanda branch between rd 4250-4675 mtr at places
Read moreConstruction of limited height sub way near at lc 50 at ir km 65 5 6 between sangariya dhaban railway station hanumangarh bhatinda section span 1 x 5.5 x 3.60m precast rcc box
Construction of limited height sub way near at lc 50 at ir km 65 5 6 between sangariya dhaban railway station hanumangarh bhatinda section span 1 x 5.5 x 3.60m precast rcc box
Read moreof your Industry type