Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
I) Telecom Cable Shifting For Track Di For Construction Of Canal Crossing Bridge No.177 A Of Track At Km 1126/9 10 Between Bmp Nab In Nagpur Division Of Secr. (Ii) Proposal For Construction Of Canal In Lieu Of National Project Crosses The Railway Track Crossing Bridge No. 221 A At Km No.1165/4 5 In Sindewahi Alewahi In Gondia Chandafort Section Of Secr.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75682467 |
|
Reference Number |
ST-Deposit-2Work-24 |
| Tender Fee | 0 |
| EMD | 27700 |
| Tender Value | - |
| Place | Bilaspur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75682467/viewNitPdf_4606375.pdf |
| Start Date | June 17, 2024 21:47 |
| End Date |
Expired
09/07/2024
Expired 827 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of rcc box for railway crossing at rd 44.40 km. of ghodazari branch canal.(br no-221-a at km 1165/3-4 between alewahi-sindewahi stations on gondia-chandafort section (bg) by pushing method)
Construction of rcc box for railway crossing at rd 44.40 km. of ghodazari branch canal.(br no-221-a at km 1165/3-4 between alewahi-sindewahi stations on gondia-chandafort section (bg) by pushing method)
Read moreConstruction of rcc box for railway crossing at rd 44.40 km. of ghodazari branch canal.(br no-221-a at km 1165/3-4 between alewahi-sindewahi stations on gondia-chandafort section (bg) by pushing method) 2nd call
Construction of rcc box for railway crossing at rd 44.40 km. of ghodazari branch canal.(br no-221-a at km 1165/3-4 between alewahi-sindewahi stations on gondia-chandafort section (bg) by pushing method) 2nd call
Read moreA: - ohe modification in connection to charging of 25 kv ohe lines inside plant premises section of ntpc-mouda siding. b: - ohe modification for proposed canal at br. no. 221a at km 1165/4-5 between sindewahi-alewahi station on gondia-chandafort. c:- ohe modification in connection with construction of rob between km 1215/6-8 bet.bargi-grg station on grg station on g-jbp section.
For complete deion and other details, please refer to tender
Read moreBalance works for construction of gosikhurd project right bank canal crossing 1 x 8.1m x 4.45 m r.c.c box at rly km 1126/9 10 between bramhapuri nagbhir station on gondia chanda fort section b.g by box pushing method
Balance works for construction of gosikhurd project right bank canal crossing 1 x 8.1m x 4.45 m r.c.c box at rly km 1126/9 10 between bramhapuri nagbhir station on gondia chanda fort section b.g by box pushing method
Read moreSoil stabilization work with combo grouting technology using polyurethane injection foam resin and cement slurry to facilitate construction of gosikhurd project right bank canal crossing 1 x 8.1m x 4.45 m r.c.c box at rly km 1126/9 10 between bramhap
Soil stabilization work with combo grouting technology using polyurethane injection foam resin and cement slurry to facilitate construction of gosikhurd project right bank canal crossing 1 x 8.1m x 4.45 m r.c.c box at rly km 1126/9 10 between bramhap
Read moreof your Industry type