Execution Of Formation, Construction Of New Platform, Ei Building, Supply Of Ballast, Transportation Of P.Way Materials, Linking Of Track And Other Allied Miscellaneous Works In Connection With Provision Of Additional Loop Line (Line No 3) And Chordline Connection From Chandrapur To Chandafort (Line No 4) At Chandafort Yard Of Nagpur Division Of S.E.C.Railway.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73109731 |
|
Reference Number |
CPM-GSU-23-NGP-2023-24 |
| Tender Fee | 0 |
| EMD | 9.8 Lakh |
| Tender Value | - |
| Place | Bilaspur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/022024/73109731/viewNitPdf_4454847.pdf |
| Start Date | January 23, 2024 17:33 |
| End Date |
Expired
16/02/2024
Expired 972 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
P.way ( track) linking work on railway formation along with linking to existing line at tangarbansali yard including supply of ballast at tangarbansali of ranchi divsion.
P.way ( track) linking work on railway formation along with linking to existing line at tangarbansali yard including supply of ballast at tangarbansali of ranchi divsion.
Read moreExecution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
Execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
Read moreProvision/modification of ohe in connection with (1) chhulha: construction of long loop line (cal-750m, ds-pt) with bi-directional 03rd line by extending de of loop line no.-5 at apr end. (2) aal: extension of de up loopl/7 at kte end with dispatch facilty to 03rd line for long haul formation & goods parking line alongwith pathway & lighting facility. (3) loa- construction of dn long haul loop (cal-1500m) by extending de of existing dn loop line no.-1 at kte end with reception facility
Provision/modification of ohe in connection with (1) chhulha: construction of long loop line (cal-750m, ds-pt) with bi-directional 03rd line by extending de of loop line no.-5 at apr end. (2) aal: extension of de up loopl/7 at kte end with dispatch facilty to 03rd line for long haul formation & goods parking line alongwith pathway & lighting facility. (3) loa- construction of dn long haul loop (cal-1500m) by extending de of existing dn loop line no.-1 at kte end with reception facility
Read moreConstruction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Read moreConstruction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Read moreConstruction of platforms, earthwork/ blanketing in formation/cutting, retaining wall & drain, rub, fob, minor bridge (br.no.466/2, 467/1, 467/2, 467/3, 467/4, 467/4, 468/1, 468/2, 469/1), station building(g+1) and station building compound wall, water tank, toilet, rub pump house, road, etc. work and dismantling and track works for nimbhora yard remodelling, including ballast supply in connection with bsl-knw 3rd and 4th line (131km) project of central railway. (two packet system).
Construction of platforms, earthwork/ blanketing in formation/cutting, retaining wall & drain, rub, fob, minor bridge (br.no.466/2, 467/1, 467/2, 467/3, 467/4, 467/4, 468/1, 468/2, 469/1), station building(g+1) and station building compound wall, water tank, toilet, rub pump house, road, etc. work and dismantling and track works for nimbhora yard remodelling, including ballast supply in connection with bsl-knw 3rd and 4th line (131km) project of central railway. (two packet system).
Read moreExecution for works for construction of box type rob on nh- 930, including casting and pushing of rcc box bridge, retaining wall/toe wall for box bridge and other allied works in connection with provision of additional loop line (line no 3) and chordline connection from chandrapur to chandafort (line no-4) at chanda fort yard of nagpur division of s.e.c.railway.
For complete deion and other details, please refer to tender
Read moreExecution of earthwork in formation, minor bridges, p.way linking works, supply of track ballast and other allied works in connection with construction of roh shed at baghuapal and construction of cc examination facilities at baghuapal.
For complete deion and other details, please refer to tender
Read moreP.way track linking, transportation of p.way material, supply & stacking of ballast, leading out of ballast, at welding and other ancillary works between af - paprera station in connection with doubling of af-bki section (km 00.00 to km 72.00)
For complete deion and other details, please refer to tender
Read moreEarth work in forming loop line, linking of track, collection of ballast, etc., at valavanur station yard in villupuram - puducherry section.
For complete deion and other details, please refer to tender
Read moreof your Industry type