Tender Details

Particulars Details
Title
Removing And Re Setting Of Reservoir Side Disturbed Stone Pitching Between Rd 100.00 Ft. To Rd 700.00 Ft. Of 1st Gap Of Left Dyke For The Year 2024 25
Description
Removing And Re Setting Of Reservoir Side Disturbed Stone Pitching Between Rd 100.00 Ft. To Rd 700.00 Ft. Of 1st Gap Of Left Dyke For The Year 2024 25
Organisation CE-BM,UM Basin,Burla | State Govt. and UT
Tender Id 2025_CEBBU_109478_1
Reference
Number
MDD-e-08/2024-25
Tender Fee 6000
EMD 16700
Tender Value
Place BURLA
Link https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=526037
Start Date January 17, 2025 15:30
End Date

27/01/2025 ( Expired 153 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Request for proposal (rfp) for the execution of wall art and lighting panel work between pillars 07 to 12 of the vertical garden located on the left side of the old varuna bridge along the kachahari to nadesar road

Request for proposal (rfp) for the execution of wall art and lighting panel work between pillars 07 to 12 of the vertical garden located on the left side of the old varuna bridge along the kachahari to nadesar road

Read more
Three phase cleaning of bushes and grass along with cutting and uprooting trees from rd 3500 ft. of 1st gap to rd 11650 ft. of 2nd gap of left dyke for the year 2025-26

Three phase cleaning of bushes and grass along with cutting and uprooting trees from rd 3500 ft. of 1st gap to rd 11650 ft. of 2nd gap of left dyke for the year 2025-26

Read more
Improvement of ravi talkies to tankapani road dibakar marg from rd 0.00km to 1.915 k both side n periodical renewal coat and from rd 1.657 km to 1.915 km left side such as construction of rcc drain at left side for the year 2025-26.

Improvement of ravi talkies to tankapani road dibakar marg from rd 0.00km to 1.915 k both side n periodical renewal coat and from rd 1.657 km to 1.915 km left side such as construction of rcc drain at left side for the year 2025-26.

Read more
Raising of boundary wall including construction of retaining walls adjacent to south-east side storm-sewer drain in csir-nml housing complex, agrico for the year 2024-25 and 2025-26

Raising of boundary wall including construction of retaining walls adjacent to south-east side storm-sewer drain in csir-nml housing complex, agrico for the year 2024-25 and 2025-26

Read more
Construction of toe wall on right side bank of belpur minor in between rd 1250 m to 1350 m of baghua irrigation project for the year 2025-26.

Construction of toe wall on right side bank of belpur minor in between rd 1250 m to 1350 m of baghua irrigation project for the year 2025-26.

Read more
Fixing of stone for demarcation of ignp land sbs from rd 113 to 192 , pd,sdy and watch and ward of canal system of sub dn iii of 23rd dn ignp mohangarh. 2024-25

Fixing of stone for demarcation of ignp land sbs from rd 113 to 192 , pd,sdy and watch and ward of canal system of sub dn iii of 23rd dn ignp mohangarh. 2024-25

Read more
Laying and relaying of disturbed kerb stone, channel and paver block at queens way north side under maidan sub-division during the year 2024-25.

Laying and relaying of disturbed kerb stone, channel and paver block at queens way north side under maidan sub-division during the year 2024-25.

Read more
Estimate for restoring of spur and construction of revetment for the protection of c-land and village abas bamial pattan on left side of river ujh in between rd 11000 to rd 14000 in district pathankot.

Estimate for restoring of spur and construction of revetment for the protection of c-land and village abas bamial pattan on left side of river ujh in between rd 11000 to rd 14000 in district pathankot.

Read more
Repair and maintenance of hr/cr/escape gate of left bank canal chain no 1300 to 2600 of rsp kudwa distt balaghat for the year 2024-25

Repair and maintenance of hr/cr/escape gate of left bank canal chain no 1300 to 2600 of rsp kudwa distt balaghat for the year 2024-25

Read more
2) permanent restoration to the l/s slope linning of d/s of chitrotpala syphone including desilting and bed clearance of mahanadi left canal from rd 0.00 km. to 6.00 km. for the year 2025-26. (mbd05/2025-26)

Permanent restoration to the l/s slope linning of d/s of chitrotpala syphone including desilting and bed clearance of mahanadi left canal from rd 0.00 km. to 6.00 km. for the year 2025-26. (mbd05/2025-26)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise