Tender Details

Particulars Details
Title
Improvement To D/S Rip Rap Such As Removing And Repacking Of Disturbed Stone Pitching, Uprooting The Existing Stem Between Rd 37600 Ft. To Rd 38200 Ft. In 4th Gap Of Left Earth Dyke For The Year 2025 26
Description
Improvement To D/S Rip Rap Such As Removing And Repacking Of Disturbed Stone Pitching, Uprooting The Existing Stem Between Rd 37600 Ft. To Rd 38200 Ft. In 4th Gap Of Left Earth Dyke For The Year 2025 26
Organisation CE-BM,UM Basin,Burla | State Govt. and UT
Tender Id 2025_CEBBU_112905_9
Reference
Number
MDD-e-01/2025-26
Tender Fee 4000
EMD 7500
Tender Value -
Place BURLA
Link
View Original Tender Notice

https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=537916

Start Date May 01, 2025 15:30
End Date
Expired 12/05/2025

Expired 483 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Restoration of disturbed stone pitching in the u/s rip rap within rd 7930.00 ft. to rd 8400.00 ft. between rl 605.00 ft. to 630.00 ft. of right earth dam for the year 2026-27

Restoration of disturbed stone pitching in the u/s rip rap within rd 7930.00 ft. to rd 8400.00 ft. between rl 605.00 ft. to 630.00 ft. of right earth dam for the year 2026-27

Read more
Removing and re-setting of reservoir side disturbed stone pitching between rd 100.00 ft. to rd 700.00 ft. of 1st gap of left dyke for the year 2024-25

Removing and re-setting of reservoir side disturbed stone pitching between rd 100.00 ft. to rd 700.00 ft. of 1st gap of left dyke for the year 2024-25

Read more
Rooting out and removal of vegetation on upstream slope and downstream slope of tenughat dam . (for 3 years), rearranging disturbed rip rap and depressed patches., closing down the gap in u/s parapet wall and providing continuous parapet wall

Rooting out and removal of vegetation on upstream slope and downstream slope of tenughat dam . (for 3 years), rearranging disturbed rip rap and depressed patches., closing down the gap in u/s parapet wall and providing continuous parapet wall

Read more
Rooting out and removal of vegetation on upstream slope and downstream slope of tenughat dam. (for 3 years), rearranging disturbed rip rap and depressed patches., closing down the gap in us parapet wall and providing continuous parapet wall and

Rooting out and removal of vegetation on upstream slope and downstream slope of tenughat dam. (for 3 years), rearranging disturbed rip rap and depressed patches., closing down the gap in us parapet wall and providing continuous parapet wall and

Read more
Three phase cleaning of bushes and grass along with cutting and uprooting trees from rd 3500 ft. of 1st gap to rd 11650 ft. of 2nd gap of left dyke for the year 2025-26

Three phase cleaning of bushes and grass along with cutting and uprooting trees from rd 3500 ft. of 1st gap to rd 11650 ft. of 2nd gap of left dyke for the year 2025-26

Read more
Work of strengthening of l/s bank u/s rd 5400 of rulaheri sarasvati tributory in a length of 400 ft by providing stone pitching in village challour after flood 2023

Work of strengthening of l/s bank u/s rd 5400 of rulaheri sarasvati tributory in a length of 400 ft by providing stone pitching in village challour after flood 2023

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise