Tender Details
Particulars | Details |
---|---|
Title |
Maintenance Of Road From Td Road To Ciyarai Para From Ch.0.00 Km To Ch.2.00 Km Total Length 2.00 Km Under Damcherra Sub Division, Pwd R And B During The Year 2025 2026 Sh Patch Metalling, Patch Carpeting, Seal Coating, Pucca Drain, Surface Drain Etc
|
Description |
Maintenance Of Road From Td Road To Ciyarai Para From Ch.0.00 Km To Ch.2.00 Km Total Length 2.00 Km Under Damcherra Sub Division, Pwd R And B During The Year 2025 2026 Sh Patch Metalling, Patch Carpeting, Seal Coating, Pucca Drain, Surface Drain Etc
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id | 2025_CEPWD_60423_1 |
Reference Number |
44/EE/KCP/2025-26. |
Tender Fee | 1000 |
EMD | 48334 |
Tender Value | |
Place | Damcherra |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=61453 |
Start Date | April 17, 2025 00:00 |
End Date |
23/04/2025 ( Expired 51 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement of road from gokulnagar panchayet office to nh 208 under kumarghat rd block l 1 550 km under pwd r and b division kumarghat sh widening gsb wbm 2 wbm 3 carpeting road side drain cd including protection work etc fatikroy assembly
Improvement of road from gokulnagar panchayet office to nh 208 under kumarghat rd block l 1 550 km under pwd r and b division kumarghat sh widening gsb wbm 2 wbm 3 carpeting road side drain cd including protection work etc fatikroy assembly
Read moreMaintenance of different road from lichubagan to lembucherra and fatikcherra to rangacherra(old nh 108b) during the year 2025-26/sh patch grouting, carpeting, seal coat etc.(l-16.00km)
Maintenance of different road from lichubagan to lembucherra and fatikcherra to rangacherra(old nh 108b) during the year 2025-26/sh patch grouting, carpeting, seal coat etc.(l-16.00km)
Read moreMtc. of road from nh-208(harina-ailmara) road to thakhirai para in between ch.0.00km to ch.0.480km during the year 2024-25/ sh - gsb (ch.0.00 km to ch.0.150km), wbm-iii, carpeting, sand seal coat and placing of cc blocks etc. (3rd call)
Mtc. of road from nh-208(harina-ailmara) road to thakhirai para in between ch.0.00km to ch.0.480km during the year 2024-25/ sh - gsb (ch.0.00 km to ch.0.150km), wbm-iii, carpeting, sand seal coat and placing of cc blocks etc. (3rd call)
Read moreMtc. of road from jolaibari kowaifung road to gurma colony (ch- 3.20 to 4.30 km)
Sh-metaling, grouting, re-carpeting, tack coat, seal coat, surface drain etc. during the year 2025-26. (gr-i)
Read moreMtc. of road from debdaru kalshi road to patichari (ch- 0.00 to 1.30 km)
Sh-metaling, grouting, re-carpeting, tack coat, seal coat, surface drain etc. during the year 2025-26.
Read moreMtc. of road from nh-08 to achaichi mog para (mla para)(ch 0.00 to 1.50 km)
Sh-metaling, grouting, re-carpeting, tack coat, seal coat, surface drain etc. during the year 2025-26.
Read moreMtc. of road from jolaibari kowaifung road to rangacherra (ch- 1.20 to 2.407 km)
Sh-metaling, grouting, re-carpeting, tack coat, seal coat, surface drain etc. during the year 2025-26.
Read moreFdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Read morePr of road from machima bazar to ibb road (l -1.12 km) (ch. 0.20 km to ch. 1.12 km, pr length - 0.92 km) under kathalia rd block within the jurisdiction of kathalia pwd (randb) subdivision during the fy 2025 26
Sh patch soling patch wbm-iii patch grouting carpeting with sand seal coat pucca drain cc block pitching and other allied works
Read morePr of road from sonamura nidaya road (bashpukur) to maramalipara (l 1.20 km) (ch. 0.35 km to ch. 1.20 km, pr length 0.85 km) under kathalia rd block within the jurisdiction of kathalia pwd(randb) subdivision during the fy 2025 26
Sh patch soling patch wbm-iii patch grouting carpeting with sand seal coat pucca drain cc block pitching and other allied works
Read moreof your Industry type