Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Maintenance Of Road From Dm Road To Halam Basti S.B School Road From Ch.0.00 Km To Ch.0.50 Km Total Length 0.50 Km Under Damcherra Sub Division, Pwd R And B During The Year 2025 2026 Sh Patch Metalling, Patch Carpeting, Seal Coating, Pucca Drain, Su
|
| Description |
Maintenance Of Road From Dm Road To Halam Basti S.B School Road From Ch.0.00 Km To Ch.0.50 Km Total Length 0.50 Km Under Damcherra Sub Division, Pwd R And B During The Year 2025 2026 Sh Patch Metalling, Patch Carpeting, Seal Coating, Pucca Drain, Su
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2025_CEPWD_60424_1 |
|
Reference Number |
45/EE/KCP/2025-26. |
| Tender Fee | 1000 |
| EMD | 32386 |
| Tender Value | - |
| Place | Damcherra |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=61454 |
| Start Date | April 17, 2025 00:00 |
| End Date |
Expired
23/04/2025
Expired 502 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Metalling and asphalting road from abbihal road via asangi tota to kesaral tota road km 0.00 to 1.50 at abbihal village in athani taluka of belagavi dist.
Metalling and asphalting road from abbihal road via asangi tota to kesaral tota road km 0.00 to 1.50 at abbihal village in athani taluka of belagavi dist.
Read moreAnnual maintenance of a) guddadarangavvanahalli to ayithol road from ch 0.00 to 4.88 km in chitradurga taluk b) belagatta to (sh-222) haledyamavanahalli road via kasavarahatti from ch 0.00 to 6.85 km in chitradurga taluk
Annual maintenance of a) guddadarangavvanahalli to ayithol road from ch 0.00 to 4.88 km in chitradurga taluk b) belagatta to (sh-222) haledyamavanahalli road via kasavarahatti from ch 0.00 to 6.85 km in chitradurga taluk
Read moreConstruction of bridge at ch.2.20 km of harave road connecting harave via ramenahalli in hunsur taluk
Construction of bridge at ch.2.20 km of harave road connecting harave via harave kalhall, ramenahalli in hunsur taluk
Read moreAnnual maintenance of guddadarangavvanahalli to (nh-50) rayanahalli road from ch 5.67 to 7.37 km in chitradurga taluk
Annual maintenance of guddadarangavvanahalli to (nh-50) rayanahalli road from ch 5.67 to 7.37 km in chitradurga taluk
Read moreAnnual maintenance of a) chikkabennuru (nh-48) to yalagodu road via bedarashivanakere basavanashivanakere hirekabbigere adavigollarahalli ch 0.00 to 7.50 and 9.52 to 13.75 km in chitradurga taluk b) palya cross to (sh-48) malali road ch 0.00 to 3.54 km in chitradurga taluk
Annual maintenance of a) chikkabennuru (nh-48) to yalagodu road via bedarashivanakere basavanashivanakere hirekabbigere adavigollarahalli ch 0.00 to 7.50 and 9.52 to 13.75 km in chitradurga taluk b) palya cross to (sh-48) malali road ch 0.00 to 3.54 km in chitradurga taluk
Read moreAnnual maintenance of yalavarthi to turuvanuru road via chikkagondanahalli gollarahatti chikkagondanahalli bangarakkanahalli ch 0.00 to 5.92 km and 7.02 to 13.80 km in chitradurga taluk
Annual maintenance of yalavarthi to turuvanuru road via chikkagondanahalli gollarahatti chikkagondanahalli bangarakkanahalli ch 0.00 to 5.92 km and 7.02 to 13.80 km in chitradurga taluk
Read moreImprovements to road from gundagallu gate to andra border via gundagallu, upparahalli, kalidevpura, tengaluru,ch 2.80 to 6.20 km in selected reaches in madhugiri
Improvements
Read moreImprovements to raod from doddayalkuru, dadagondanahalli, tippapura, adavinagenahalli, singanahalli, tireyuru, kadagathuru, joining andra boder road from ch 21.60 to 23.00 km(kadagathuru to hanumanapalli border) in madhugiri taluk
Improvements to raod from doddayalkuru, dadagondanahalli, tippapura, adavinagenahalli, singanahalli, tireyuru, kadagathuru, joining andra boder road from ch 21.60 to 23.00 km(kadagathuru to hanumanapalli border) in madhugiri
Read moreConstruction of rob at ch-26th km of sobhan chowk (nh-27) to agropatti chowk makia (sh-52) road project (announced during pragati yatra) under district of darbhanga, bihar on epc mode
Construction of rob at ch-26th km of sobhan chowk (nh-27) to agropatti chowk makia (sh-52) road project (announced during pragati yatra) under district of darbhanga, bihar on epc mode
Read moreMaintenance of road from t.d road to halam basti from ch.1.00 km to ch.2.42 km total length 1.42 km under damcherra sub division, pwd r and b during the year 2025 2026 sh patch metalling,grouting,carpeting, seal coating, surface drains, pucca drain
Maintenance of road from t.d road to halam basti from ch.1.00 km to ch.2.42 km total length 1.42 km under damcherra sub division, pwd r and b during the year 2025 2026 sh patch metalling,grouting,carpeting, seal coating, surface drains, pucca drain
Read moreof your Industry type