Tender Details
Particulars | Details |
---|---|
Title |
AAAAAAAAAA Login to view |
Description |
Replacement Of Old Compound And Street Lighting With New Energy Efficient Led Type Compound And Street Lighting At Allahabad Museum, Prayagraj.
|
Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 1.33 Lakh |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | May 07, 2025 21:00 |
End Date |
17/05/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Read morePlanning, design, engineering, construction, supply, installation and commissioning of sewerage treatment plant, sewer network and plant room with operation and maint. for 05 yrs for central hospital residential colony old and new on turnkey basis.
Planning, design, engineering, construction, supply, installation and commissioning of sewerage treatment plant, sewer network and plant room with operation and maint. for 05 yrs for central hospital residential colony old and new on turnkey basis.
Read moreDesign constrn of 60 mtr maj pmt br with steel superstructure at km 249 and 20 mtr steel girder type superstructure at km 185.2 on open fdn incl ssi and proof check of design drg fm iit at incl approach rd on npd rd under 126rcc 13tf yojak in ladakh
Design constrn of 60 mtr maj pmt br with steel superstructure at km 249 and 20 mtr steel girder type superstructure at km 185.2 on open fdn incl ssi and proof check of design drg fm iit at incl approach rd on npd rd under 126rcc 13tf yojak in ladakh
Read more85944 repair, maint and replacement of lift eqpt and other connected works at new ch(sc) and connected area of age e/m-ii under ge (south) pune
85944 repair, maint and replacement of lift eqpt and other connected works at new ch(sc) and connected area of age e/m-ii under ge (south) pune
Read moreConstruction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Construction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Read moreReplacement of apron flood light old lt feeder panel and provision of airfield lighting control and monitoring system alcms at dehradun airport
Replacement of apron flood light old lt feeder panel and provision of airfield lighting control and monitoring system alcms at dehradun airport
Read moreDay to day complaints of street lights, repair/ replacement lt street light panel, lt distribution cables for street/ security light with allied works in otm accn of flaming arrow bde at nams
Day to day complaints of street lights, repair/ replacement lt street light panel, lt distribution cables for street/ security light with allied works in otm accn of 
 flaming arrow bde at nams
Read moreRenewal/ replacement of asbestos cement roof with galvalume sheets in new melting work shop(nms) inside factory at of katni.
Renewal/ replacement of asbestos cement roof with galvalume sheets in new melting work shop(nms) inside factory at of katni.
Read moreWbphed/ee/md/niet_14 of 2025-2026, sl.no.10
Sinking of 200mm (all through) big dia. tube well, construction of pump house, boundary wall, interconnection and allied works approach road, laying of distribution pipe and fhtc at new source site of kaluari pwss under old malda block under malda
Read moreProvn of 3 phase isolation transformer and installation of new automatic weather station along with allied works at af stn awantipur
Provn of 3 phase isolation transformer and installation of new automatic weather station along with allied works at af stn awantipur
Read moreof your Industry type