Tender Details
Particulars | Details |
---|---|
Title |
Procurement Of Undersized Bearing (Bb1) And Spares Of Oil Circuit, Fuel Nozzle And Soli D Bucket Hardware For Gtg I/Ii
|
Description |
Procurement Of Undersized Bearing (Bb1) And Spares Of Oil Circuit, Fuel Nozzle And Soli D Bucket Hardware For Gtg I/Ii
|
Organisation | Central Public Procurement Portal 2 |
Tender Id | 2023_NFL_161541_1 |
Reference Number |
220536220546220104230101 |
Tender Fee | 1 |
EMD | 1 Lakh |
Tender Value | |
Place | NFL VIJAIPUR GUNA MP |
Link | https://etenders.gov.in |
Start Date | July 19, 2023 19:30 |
End Date |
10/08/2023 ( Expired 643 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) category- ii (100-200 lacs)- empanelment for ii nd year
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) and category- ii (100-200 lacs)- empanelment for ii nd year
Read morePublic tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Public tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreManufacture and supply of erw steel tubes for air preheaters of 210 mw capacity boilers of sgtps, ph-i and ph-ii, birsinghpur.
Manufacture and supply of erw steel tubes for air preheaters of 210 mw capacity boilers of sgtps, ph-i and ph-ii, birsinghpur.
Read moreLot i package civil works package for 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot i civil works comprising of hrt including adits, surge shaft including adits, pressure shaft including adits, underground p/h cavern, bus ducts, underground transformer cavern, underground dt gate operation cavern and others as per scope of work.
Read morePrequalification of cost audit firms for conducting cost audit of nfls nangal bathinda panipat and vijaipur i and ii units and consolidation of cost audit reports of all the five units for the year 25-26 26-27 27-28.
Prequalification of cost audit firms for conducting cost audit of nfls nangal bathinda panipat and vijaipur i and ii units and consolidation of cost audit reports of all the five units for the year 25-26 26-27 27-28.
Read moreProvn of single accn for officers alongwith central heating system (chs) in officers mess (ph-i and ph ii) under ge (i) (p) no. 1, leh
Provn of single accn for officers alongwith central heating system (chs) in officers mess (ph-i and ph ii) under ge (i) (p) no. 1, leh
Read moreSupply of seals for rotary aph of ph-iii atps,chachai, ph-iv stps sarni and ph-i and ii sstpp dongalia
Supply of seals for rotary air pre heater of ph-iii atps,&#x0d chachai, ph-iv stps sarni and ph-i and ii sstpp dongalia&#x0d
Read moreConstruction of compound wall for balance social facility plots at nagar- i, ii and iv cidco waluj mahanagar.
Construction of compound wall for balance social facility plots at nagar- i, ii and iv cidco waluj mahanagar.
Read moreDesign, engineering, manufacture, survey, supply, transportation, erection, testing n commissioning for (i) thickening of existing 33 kv khellani-doda-ii line and (ii) erection of new 33kv line on acsr wolf conductor from bheli ghat to dhara
Design, engineering, manufacture, survey, supply, transportation, erection, testing n commissioning for (i) thickening of existing 33 kv khellani-doda-ii line and (ii) erection of new 33kv line on acsr wolf conductor from bheli ghat to dhara
Read moreof your Industry type