Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Rob On Ramganj Mandi Jhalawar Railway Lc No. 3 A/2 E Suket Pipaliya Road Km. 8/0 (Mdr 109)
|
| Description |
Construction Of Rob On Ramganj Mandi Jhalawar Railway Lc No. 3 A/2 E Suket Pipaliya Road Km. 8/0 (Mdr 109)
|
| Organisation | PWD - CE AND AS | State Govt. and UT |
| Tender Id | 2025_CEPWD_458738_1 |
|
Reference Number |
ACE PWD ZONE KOTA NITNO-26/2024-25 |
| Tender Fee | 22500 |
| EMD | 50 Lakh |
| Tender Value | - |
| Place | KOTA |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=823323 |
| Start Date | April 11, 2025 23:50 |
| End Date |
Expired
02/05/2025
Expired 533 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Preparation of detailed project report (dprs) for various rob and rub works ( 81 nos lc) over north western railway
Preparation of detailed project report (dprs) for various rob and rub works ( 81 nos lc) over north western railway
Read moreRob/st-34/assam/raha/balance work construction of rob at kakati gaon in replacement of railway lc gate no. st-34 at rly km 104/7-8 on raha kampur road under construction of robs on 50_50 cost sharing basis (balance work)
Rob/st-34/assam/raha/balance work construction of rob at kakati gaon in replacement of railway lc gate no. st-34 at rly km 104/7-8 on raha kampur road under construction of robs on 50_50 cost sharing basis (balance work)
Read moreConstruction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Construction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Read moreConstruction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Read moreCarrying out site survey, geo-technical investigation, preparation of preliminary alignment design and general arrangement drawing (gad) for construction of road over bridge (rob) in lieu of 12 nos. level crossing (lc) gate over konkan railway.
Carrying out site survey, geo-technical investigation, preparation of preliminary alignment design and general arrangement drawing (gad) for construction of road over bridge (rob) in lieu of 12 nos. level crossing (lc) gate over konkan railway.
Read moreDesign, supply, erection, testing & commissioning of 25 kv, 50 hz, single phase, ac electrification including new ssp at gorakhpur station of ljn division, ohe work at maharajganj station of bsb division & ohe modification work at various proposed rob under electrical construction unit gorakhpur (at lc no - 115 spl in bhatni yard, lc 67c in padrauna, lc no.4 in indara) in ne railway.
Design, supply, erection, testing & commissioning of 25 kv, 50 hz, single phase, ac electrification including new ssp at gorakhpur station of ljn division, ohe work at maharajganj station of bsb division & ohe modification work at various proposed rob under electrical construction unit gorakhpur (at lc no - 115 spl in bhatni yard, lc 67c in padrauna, lc no.4 in indara) in ne railway.
Read moreTrd related work in connection to the work of utility shifting for construction of rob at railway km 214.954 in liu of lc no. rv-172 at railway km 215/5-7 on nh-201(chainage 176km) near kesinga between kesinga-titlagarh station in titlagarh-theruvali section under sambalpur division .
Trd related work in connection to the work of utility shifting for construction of rob at railway km 214.954 in liu of lc no. rv-172 at railway km 215/5-7 on nh-201(chainage 176km) near kesinga between kesinga-titlagarh station in titlagarh-theruvali section under sambalpur division .
Read moreConstruction of proposed rob at km 426/21-23 in lieu of lc no.184 at km. 426/21-23 in between bbsr new and mancheswar railway stations on howrah-chennai main line in the district of khordha under state plan for the year 2026-27
Construction of proposed rob at km 426/21-23 in lieu of lc no.184 at km. 426/21-23 in between bbsr new and mancheswar railway stations on howrah-chennai main line in the district of khordha under state plan for the year 2026-27
Read moreConstruction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreof your Industry type