Tender Details
Particulars | Details |
---|---|
Title |
Painting Of Actuators At Site And Panels In Dcs Room Ups, Repairing Of Lock Of Panels In Dcs Room Etc. And Overhauling And Servicing Of Drain/ Isolating Valve, Manifold, Impulse Lines In Oh Unit No. 6, 2 X250 Mw, Ptpp, Parichha
|
Description |
Painting Of Actuators At Site And Panels In Dcs Room Ups, Repairing Of Lock Of Panels In Dcs Room Etc. And Overhauling And Servicing Of Drain/ Isolating Valve, Manifold, Impulse Lines In Oh Unit No. 6, 2 X250 Mw, Ptpp, Parichha
|
Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 590 |
EMD | 7000 |
Tender Value | |
Place | CTPS PARICHHA |
Link |
AAAAAAAAAA Login to view |
Start Date | April 08, 2025 19:30 |
End Date |
05/05/2025 ( 15 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Overhauling of various capacities lt motors and switchgear of unit #6
Overhauling of various capacities lt motors ranging from &#x0d fractional kw to 170 kw of 0.4 kv/220 v dc and 0.4 kv lt &#x0d switchgears of unit 6 bop during proposed overhauling of unit &#x0d no. 6 in 2x250 mw, ptpp parichha jhansi
Read moreOverhauling of procon make annunciation system along with contacts cleaning, tightening of terminals and reconditioning of yokogawa dcs panels during oh of unit 6 of 2x250mw, ctps, parichha, jhansi
Overhauling of procon make annunciation system along with contacts cleaning, tightening of terminals and reconditioning of yokogawa dcs panels during oh of unit 6 of 2x250mw, ctps, parichha, jhansi
Read morePainting of actuators at site and panels in dcs room ups, repairing of lock of panels in dcs room etc. and overhauling and servicing of drain/ isolating valve, manifold, impulse lines in oh unit no. 6, 2x250 mw, ptpp, parichha
Painting of actuators at site and panels in dcs room ups, repairing of lock of panels in dcs room etc. and overhauling and servicing of drain/ isolating valve, manifold, impulse lines in oh unit no. 6, 2x250 mw, ptpp, parichha
Read moreOver hauling of electrical system of esp during overhauling of unit no. 6
Over hauling of electrical system of esp and various &#x0d miscellaneous works of esp during overhauling of unit no. 6, &#x0d 2x250 mw,ctps, ptpp parichha (jhansi)
Read moreWork of preparation of statement in shift of control room 2x210 mw, ptpp, parichha along with computer accessories and consumables with the help of trained computer operators
Work of preparation of statement in shift of control room &#x0d 2x210 mw, ptpp, parichha along with computer accessories &#x0d and consumables with the help of trained computer operators.
Read moreThermal insulation of steam lines feed water lines lphs hphs valves nrvs during capital overhauling of turbine of unit no 6 2x250 mw ptpp parichha
Thermal insulation of steam lines feed water lines lphs hphs valves nrvs during capital overhauling of turbine of unit no 6 2x250 mw ptpp parichha
Read moreRepairing, fabrication and machining of miscellaneous items required during overhauling of tg
Repairing, fabrication and machining of miscellaneous items required during overhauling of tg and its auxiliaries of unit6 of 2x250 mw, ctps, parichha
Read moreSupply of crusher spares for chp 2x210 mw and 2x250 mw in ptpp, parichha, jhansi (up)
Supply of crusher spares for chp 2x210 mw and 2x250 mw in &#x0d ptpp, parichha, jhansi (up)
Read moreOverhauling and servicing of complete candi field instruments and turbovisory including its control panel circuit 3500 bentley nevada system in oh unit 6 of 2x250mw, c ptpp, parichha
Overhauling and servicing of complete candi field instruments and turbovisory including its control panel circuit 3500 bentley nevada system in oh unit 6 of 2x250mw, c ptpp, parichha
Read moreRepairing of mill inlet duct casing and servicing of associated gates dampers actuators during upcoming overhauling unit 1 sgtpp scheduled in august 2025
Repairing of mill inlet duct casing and servicing of associated gates dampers actuators during upcoming overhauling unit 1 sgtpp scheduled in august 2025
Read moreof your Industry type