Major Overhauling Of Pa Fans 6 A And Associated Works Of Unit 6, 2x250 Mw, Ptpp, Parichha, Jhansi During Short Shut Down Of Unit No. 6 Of 2 X250 Mw, Ptpp, Parichha Jhansi
|
Description |
Major Overhauling Of Pa Fans 6 A And Associated Works Of Unit 6, 2x250 Mw, Ptpp, Parichha, Jhansi During Short Shut Down Of Unit No. 6 Of 2 X250 Mw, Ptpp, Parichha Jhansi
|
Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
Tender Id | 2024_RVUNL_983574_1 |
Reference Number |
NPAR/C/OMC2/BMD2/6000006621_00 |
Tender Fee | 590 |
EMD | 2500 |
Tender Value | |
Place | PTPP, PARICHHA |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1732164 |
Start Date | December 14, 2024 23:30 |
End Date |
31/12/2024 ( Expired 158 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
In situ inspection of boiler pressure part tubes by rfet (remote field electromagnetic technique) during overhauling of unit no-03 of 3x210 mw, atps, anpara, sonebhadra.
In situ inspection of boiler pressure part tubes by rfet (remote field electromagnetic technique) during overhauling of unit no-03 of 3x210 mw, atps, anpara, sonebhadra.
Read moreCleaning spray painting nomenclature and repairing of locks of jbs lie lir panels installed at boiler and turbine side in unit 3 and 4 of 2x210 mw ptpp parichha
Cleaning spray painting nomenclature and repairing of locks of jbs lie lir panels installed at boiler and turbine side in unit 3 and 4 of 2x210 mw ptpp parichha
Read moreOverhauling of cw and rcw pump during upcoming overhauling of unit 5 (215 mw)
Overhauling of cw and rcw pump during upcoming overhauling of unit 5 (215 mw)&#x0d
Read moreApplication and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Read moreOverhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Overhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Read moreServicing overhauling and maintenance of swas field equipments and wet panel and different other mechanical work during overhauling of unit no 13 of 2x200mw btps obra
Servicing overhauling and maintenance of swas field equipments and wet panel and different other mechanical work during overhauling of unit no 13 of 2x200mw btps obra
Read moreErection commissioning and changing the instruments of turbine panel at tg floor 9 mtrs including fabrication fixing of instruments tags during overhauling of unit no 13
Erection commissioning and changing the instruments of turbine panel at tg floor 9 mtrs including fabrication fixing of instruments tags during overhauling of unit no 13 btps obra
Read moreSupply of oil seal and v belt for chp 2x210 mw and 2x250
Supply of oil seal and v belt for chp 2x210 mw and 2x250 &#x0d mw in ptpp, parichha, jhansi.
Read moreDesign engineering supply erection testing and commissioning of dcs based control system and associated works on epc mode for the project supply installation testing and commissioning of fgd system for 1x500 mw unit 6 ukai tps
Design engineering supply erection testing and commissioning of dcs based control system and associated works on epc mode for the project supply installation testing and commissioning of fgd system for 1x500 mw unit 6 ukai tps
Read moreDeployment of radiography team with remote operated gamma radiography shots thickness survey and phase ultrasonic testing during overhauling of unit 9 2x250mw htps kasimpur
Deployment of radiography team with remote operated gamma radiography shots thickness survey and phase ultrasonic testing during overhauling of unit 9 2x250mw htps kasimpur