Tender Details

Particulars Details
Title
Construction Of Concrete Drain With Cover Plates From Haripura House Of Santosh Bera To House Of Shyamal Bera
Description
Construction Of Concrete Drain With Cover Plates From Haripura House Of Santosh Bera To House Of Shyamal Bera
Organisation Zilla Parishad | State Govt. and UT
Tender Id 2025_ZPHD_798194_5
Reference
Number
WB/PMZP/SBG/NGP/NIET-12 of 2024-25
Tender Fee 250
EMD 4000
Tender Value
Place Haripura
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1771258

Start Date January 10, 2025 19:30
End Date
Expired 16/01/2025

Expired 552 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Read more
Construction of concrete drain with cover plates from haripura house of santosh bera to house of shyamal bera

Construction of concrete drain with cover plates from haripura house of santosh bera to house of shyamal bera

Read more
Construction of concrete drain with cover from house of shyamal dhara to koltola at moula.

Construction of concrete drain with cover from house of shyamal dhara to koltola at moula.

Read more
Construction of cover concrete drain with soak pit from u langalberia manas pal house to shyamal manna house

Construction of cover concrete drain with soak pit from u langalberia manas pal house to shyamal manna house

Read more
Construction of concrete road from salikotha santosh jana house towards nikhil shyamal house

Construction of concrete road from salikotha santosh jana house towards nikhil shyamal house

Read more
Construction of concrete drain with slab cover from swapan hati baraj to santosh das house at tamalda

Construction of concrete drain with slab cover from swapan hati baraj to santosh das house at tamalda

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise