Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Services For Authority Engineer For Supervision Of 1.Balance Work Of Nh 66 From Design Km 84.000 To Km 87.100 (Indapur Bypass) And Km 91.600 To Km 99.100 ( Mangaon Bypass) To Four Lane With Paved Shoulder In The State Of Maharashtra Und
|
| Description |
Consultancy Services For Authority Engineer For Supervision Of 1.Balance Work Of Nh 66 From Design Km 84.000 To Km 87.100 (Indapur Bypass) And Km 91.600 To Km 99.100 ( Mangaon Bypass) To Four Lane With Paved Shoulder In The State Of Maharashtra Und
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2025_MoRTH_847976_1 |
|
Reference Number |
No.NHD/PEN/AB/TC/345/2024-25 |
| Tender Fee | 10000 |
| EMD | 6 Lakh |
| Tender Value | - |
| Place | PEN |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=891436 |
| Start Date | February 07, 2025 21:30 |
| End Date |
Expired
01/04/2025
Expired 562 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for preparation of dpr for i widening upgradation to two lane with paved shoulder on nh 169a from km. 30.75 to km. 51.60 agumbe ghat, ii construction of two lane with paved shoulder for thirtahalli bypass starts on from nh169a
Consultancy services for preparation of dpr for i widening upgradation to two lane with paved shoulder on nh 169a from km. 30.75 to km. 51.60 agumbe ghat, ii construction of two lane with paved shoulder for thirtahalli bypass starts on from nh169a
Read moreConstruction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreConstruction of 4 lane with paved shoulder daudnagar bypass from km 93.915 to km 102.290 of nh 139 on naubatpur _ hariharganj road in the state of bihar on epc mode.
Construction of 4 lane with paved shoulder daudnagar bypass from km 93.915 to km 102.290 of nh 139 on naubatpur _ hariharganj road in the state of bihar on epc mode.
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreAbilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Abilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Read moreConsultancy services for authoritys engineer for supervision of the work of construction of 4-lane with paved shoulder of sri muktsar sahib bypass from existing km 269.960 of nh-354 to existing km 39.280 of nh - 754 in the state of punjab.
Consultancy services for authoritys engineer for supervision of the work of construction of 4-lane with paved shoulder of sri muktsar sahib bypass from existing km 269.960 of nh-354 to existing km 39.280 of nh - 754 in the state of punjab.
Read moreRfp for balance work of nh 66 from design km 84.000 to km 87.100 (indapur bypass) and km 91.600 to km 99.100 (mangaon bypass) to four-lane with paved shoulder in the state of maharashtra under nh(o) on epc mode (length10.60 km)
Rfp for balance work of nh 66 from design km 84.000 to km 87.100 (indapur bypass) and km 91.600 to km 99.100 (mangaon bypass) to four-lane with paved shoulder in the state of maharashtra under nh(o) on epc mode (length10.60 km)
Read moreBalance work of rehabilitation and upgradation of indapur to veer (wadpale) section of nh-17 (new nh-66) from existing km 84.000 to km 108.400 (design ch. 84.000 to 110.750) to 4-lane with paved shoulder in the state of maharashtra through epc mode
Balance work of rehabilitation and upgradation of indapur to veer (wadpale) section of nh-17 (new nh-66) from existing km 84.000 to km 108.400 (design ch. 84.000 to 110.750) to 4-lane with paved shoulder in the state of maharashtra through epc mode
Read moreConstruction work of andhau chaukiya bypass road (two lane with paved shoulder) in distt ghazipur
Construction work of andhau chaukiya bypass road (two lane with paved shoulder) in distt ghazipur
Read moreof your Industry type