Tender Details

Particulars Details
Title
Consultancy Services For Authority Engineer For Supervision Of 1.Balance Work Of Nh 66 From Design Km 84.000 To Km 87.100 (Indapur Bypass) And Km 91.600 To Km 99.100 ( Mangaon Bypass) To Four Lane With Paved Shoulder In The State Of Maharashtra Und
Description
Consultancy Services For Authority Engineer For Supervision Of 1.Balance Work Of Nh 66 From Design Km 84.000 To Km 87.100 (Indapur Bypass) And Km 91.600 To Km 99.100 ( Mangaon Bypass) To Four Lane With Paved Shoulder In The State Of Maharashtra Und
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2025_MoRTH_847976_1
Reference
Number
No.NHD/PEN/AB/TC/345/2024-25
Tender Fee 10000
EMD 6 Lakh
Tender Value -
Place PEN
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=891436

Start Date February 07, 2025 21:30
End Date
Expired 01/04/2025

Expired 562 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Consultancy services for preparation of dpr for i widening upgradation to two lane with paved shoulder on nh 169a from km. 30.75 to km. 51.60 agumbe ghat, ii construction of two lane with paved shoulder for thirtahalli bypass starts on from nh169a

Consultancy services for preparation of dpr for i widening upgradation to two lane with paved shoulder on nh 169a from km. 30.75 to km. 51.60 agumbe ghat, ii construction of two lane with paved shoulder for thirtahalli bypass starts on from nh169a

Read more
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode

Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.

Read more
Construction of 4 lane with paved shoulder daudnagar bypass from km 93.915 to km 102.290 of nh 139 on naubatpur _ hariharganj road in the state of bihar on epc mode.

Construction of 4 lane with paved shoulder daudnagar bypass from km 93.915 to km 102.290 of nh 139 on naubatpur _ hariharganj road in the state of bihar on epc mode.

Read more
Construction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode

Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Abilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas

Abilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas

Read more
Consultancy services for authoritys engineer for supervision of the work of construction of 4-lane with paved shoulder of sri muktsar sahib bypass from existing km 269.960 of nh-354 to existing km 39.280 of nh - 754 in the state of punjab.

Consultancy services for authoritys engineer for supervision of the work of construction of 4-lane with paved shoulder of sri muktsar sahib bypass from existing km 269.960 of nh-354 to existing km 39.280 of nh - 754 in the state of punjab.

Read more
Rfp for balance work of nh 66 from design km 84.000 to km 87.100 (indapur bypass) and km 91.600 to km 99.100 (mangaon bypass) to four-lane with paved shoulder in the state of maharashtra under nh(o) on epc mode (length10.60 km)

Rfp for balance work of nh 66 from design km 84.000 to km 87.100 (indapur bypass) and km 91.600 to km 99.100 (mangaon bypass) to four-lane with paved shoulder in the state of maharashtra under nh(o) on epc mode (length10.60 km)

Read more
Balance work of rehabilitation and upgradation of indapur to veer (wadpale) section of nh-17 (new nh-66) from existing km 84.000 to km 108.400 (design ch. 84.000 to 110.750) to 4-lane with paved shoulder in the state of maharashtra through epc mode

Balance work of rehabilitation and upgradation of indapur to veer (wadpale) section of nh-17 (new nh-66) from existing km 84.000 to km 108.400 (design ch. 84.000 to 110.750) to 4-lane with paved shoulder in the state of maharashtra through epc mode

Read more
Construction work of andhau chaukiya bypass road (two lane with paved shoulder) in distt ghazipur

Construction work of andhau chaukiya bypass road (two lane with paved shoulder) in distt ghazipur

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise