Tender Details

Particulars Details
Title
Consultancy Services For Authoritys Engineer For Supervision Of The Work Of Construction Of 4 Lane With Paved Shoulder Of Sri Muktsar Sahib Bypass From Existing Km 269.960 Of Nh 354 To Existing Km 39.280 Of Nh 754 In The State Of Punjab.
Description
Consultancy Services For Authoritys Engineer For Supervision Of The Work Of Construction Of 4 Lane With Paved Shoulder Of Sri Muktsar Sahib Bypass From Existing Km 269.960 Of Nh 354 To Existing Km 39.280 Of Nh 754 In The State Of Punjab.
Organisation Ministry of Road Transport and Highways | P1 Delhi - MoRTH | RO Chandigarh - MoRTH
Tender Id Login to view
Reference
Number
Login to view
Tender Fee 5000
EMD -
Tender Value -
Place
Link Login to view
Start Date July 21, 2026 00:25
End Date
Open 19/11/2026

37 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Consultancy services for authoritys engineer for supervision of widening of existing 2 lane to 4 lane with paved shoulder from km. 32.950 to km. 55.400 (thavar to jherda section) of nh 168a in the state of gujarat on epc mode

Consultancy services for authoritys engineer for supervision of widening of existing 2 lane to 4 lane with paved shoulder from km. 32.950 to km. 55.400 (thavar to jherda section) of nh 168a in the state of gujarat on epc mode

Read more
Consultancy services for authoritys engineer for upgradation to 2 -lane with paved shoulders from km. 220.773 to 288.987 (naliya-narayan sarovar stretch) of nh-41 in the state of gujarat on epc mode

Consultancy services for authoritys engineer for upgradation to 2 -lane with paved shoulders from km. 220.773 to 288.987 (naliya-narayan sarovar stretch) of nh-41 in the state of gujarat on epc mode

Read more
Consultancy services for authoritys engineer for upgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode

Consultancy services for authoritys engineer for upgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode

Read more
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507

Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507

Read more
Upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode

Upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode

Read more
Widening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)

Widening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)

Read more
Cs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp

Cs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp

Read more
Consultancy services for authoritys engineer for supervision of balance work of the rehabilitation and upgradation from km 33.860 to km 67.150 of the naldurge to akkalkot section of nh 652 to 2 lane with paved shoulder configuration in the state of m

Consultancy services for authoritys engineer for supervision of balance work of the rehabilitation and upgradation from km 33.860 to km 67.150 of the naldurge to akkalkot section of nh 652 to 2 lane with paved shoulder configuration in the state of m

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to two lane with paved shoulders in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to two lane with paved shoulders in the state of madhya pradesh on epc mode

Read more
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)

Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise