Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
03/ Niq/Ee/Divn Iv /Housing/Kmda(2nd Call) Of 2025 26 Dt. 17.10.2025
|
| Description |
Deployment Of Private Security Guard/Supervisor For Safe Guarding Of (G Plus 5) Storied Logistic Hub For One Year (365 Days) Round The Clock In Three (03) Shifts At Gardenreach. (2nd Call)
|
| Organisation | KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY | State Govt. and UT |
| Tender Id | 2025_KMDA_934415_1 |
|
Reference Number |
03/ NIQ/EE/DIVN-IV/ HOUSING/KMDA(2nd call) of 2025-26 Dt. 17.10.2025 |
| Tender Fee | 0 |
| EMD | 57000 |
| Tender Value | - |
| Place | Gardenreach Logistic Hub |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2195897 |
| Start Date | November 04, 2025 23:00 |
| End Date |
Expired
19/11/2025
Expired 327 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of conference hall at vikarabad of vikarabad district (balance work). 2nd call
Construction of conference hall at vikarabad of vikarabad district (balance work). 2nd call
Read moreConstruction of 1 dsp ar quarter, 1dsp admin quarter, 2ri quarters and 4rsi quarters at medak district. sub work:- construction of compound wall and laying of cc road for 8 nos quarters at medak (2nd call)
Construction of 1 dsp ar quarter, 1dsp admin quarter, 2ri quarters and 4rsi quarters at medak district. sub work:- construction of compound wall and laying of cc road for 8 nos quarters at medak (2nd call)
Read moreCc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Cc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Read moreConstruction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call
Construction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call
Read moreRepairs to the existing rooms and construction of new toilets in 2nd floor in the model market champapet in ward-38, champapet, lb nagar circle-13, mmc (a.s.date 30-09-2026, budget year 2026-27) (reserved for individual/ sc lccs contractors, proprietaryship/ partnerships.) as per g.o. ms no.59, i and cad(reforms) dept, dt:21.05.2018
Repairs to the existing rooms and construction of new toilets in 2nd floor in the model market champapet in ward-38, champapet, lb nagar circle-13, mmc (a.s.date 30-09-2026, budget year 2026-27) (reserved for individual/ sc lccs contractors, proprietaryship/ partnerships.) as per g.o. ms no.59, i and cad(reforms) dept, dt:21.05.2018
Read moreProviding of 2nd alternate source to 33/11kv srinagar colony indoor ss from 132/33kv nims eht ss by laying of 4.5 km single run 33kv 400sqmm xlpe ug cable pertaining to kalyan nagar lines section and sub division of banjarahills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of hyderabad master plan circle under t and d improvement works
Providing of 2nd alternate source to 33/11kv srinagar colony indoor ss from 132/33kv nims eht ss by laying of 4.5 km single run 33kv 400sqmm xlpe ug cable pertaining to kalyan nagar lines section and sub division of banjarahills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of hyderabad master plan circle under t and d improvement works
Read moreProviding of 2nd alternate source to 33/11kv kundanbagh indoor ss by laying of 1.2km 33kv 3x400sq.mm. xlpe ug cable (double run) from 33/11kv green lands ss to 33/11kv kundanbagh indoor ss pertaining to allwyn lines section and sub division of banjara hills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of master plan hyderabad circle under t and d improvements to original works (reserved for sc categ
Providing of 2nd alternate source to 33/11kv kundanbagh indoor ss by laying of 1.2km 33kv 3x400sq.mm. xlpe ug cable (double run) from 33/11kv green lands ss to 33/11kv kundanbagh indoor ss pertaining to allwyn lines section and sub division of banjara hills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of master plan hyderabad circle under t and d improvements to original works (reserved for sc category).
Read more03/nit/ee/divn-iv/housing/kmda (2nd call) of 2024-25 dt. 18.11.2024
Repairing and renovation works of the office of the chief engineer and executive engineer, r.e. div-iv, housing sector, kmda at l- block, 2nd floor unnayan bhawan.(2nd call)
Read more02/ niq/ee/divn-iv/housing/kmda of 2024-25 dt. 02.09.2024
Deployment of private security guard or attendant or supervisor for safe guarding of (g plus 5) storied gardenreach logistic hub for one year (365 days) round the clock in three shifts at gardenreach logistic hub.
Read moreof your Industry type