Tender Details
Particulars | Details |
---|---|
Title |
Hubballi Division: Ubl Kjg Section: Construction Of Bridge Of Size 3x3x34m At Km 425/500 700 Between Ylg Gdi( Yelvigi Gudageri ) Stations By Cut &Amp Cover/Rh Girder Method With Retaining Wall.( Maintenance Period 03 Months)
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76269327 |
Reference Number |
19UBL24-25DT150724ITEM-05 |
Tender Fee | 0 |
EMD | 2.51 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/082024/76269327/viewNitPdf_4643736.pdf |
Start Date | July 20, 2024 18:55 |
End Date |
12/08/2024 ( Expired 274 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of road over bridge with subway in lieu of level crossing no.86 as 1x30m composite girder with 8x18m psc girder towards hassan side and 8x18m psc girder towards nh side at railway km.142/700-800 between tiptur and honnavalli road stations in tumakuru- arsikere section.(composite work).
For complete deion and other details, please refer to tender
Read moreBengaluru division: balance work of replacement of steel girder with psc slab for bridge no. 550 at km 45/400-500 between ramanagaram (rmgm) -channapatna (cpt) stations in sbc - mys section. maintenance period is 3 months.
For complete deion and other details, please refer to tender
Read more1. sw-i sc division: kzj-bza section - provision of additional vent way to bridge no. 569 a (up & dn line portion) as precast rcc box of size 2 x 5.50x3.00m at km 430/10-12 between kesamudram - tadalapusapalli stations by air pushing method using 20.40m rh girder. 2. sw-ii sc division: kzj-bza section - provision of additional vent way to bridge no. 569 b (up & dn line portion) as precast rcc box of size 2 x 5.50x3.00m at km 430/18-20 between kesamudram - tadalapusapalli station
For complete deion and other details, please refer to tender
Read moreHubballi division: strengthening of super structure by re-girdering of br no. 142/a (span 1x13.18m pg rub) at km 680/500-600 between gpb-ckr stations in ld-mrj section of ubl division.
For complete deion and other details, please refer to tender
Read moreHubballi division:-prposed replacement of pipe bridge at br.no 33a at km.96/900-97/000 and bridge no:41 at km.104/900-105/000 between bagalkot (bgk) jadramakunti (jrjt) stations by cut and cover rh girder method.
For complete deion and other details, please refer to tender
Read moreSr. den/north/sbc sec : bengaluru-sampige road section : proposed construction of rub of size 1x6x3m in lieu of lc no. 60 at km 98/600-700 between nittur (ntr) and sampige road (spgr) stations for double track along with u-type rcc retaining wall and bt road connecting lc no. 60 and lc no. 59. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreHubballi-ballari section : proposed construction of road over bridge (rob) at km 134/700-800 in lieu of lc-77 between ginigera-munirabad stations at 1x30.0mt clear span composite girder (railway span) with 3x18.46mt psc girder and cc blocks as approaches including temporary di road and service road on both sides of rob with drainage facility.
For complete deion and other details, please refer to tender
Read moreHubli division :sw-i: painting and greasing for the bridges due for year 2024-25 & 2025-26 under jurisdiction of sse/br/ubl and sse/br/bgm. sw-ii: proposal for replacement of elastomeric bearings in br no 10, br no 13.br no 25 in ubl-gdg section, br no 63 in gdg-hpt section, br no 200, br no 206 in hpt-bay section and br no 08 in gdg-hg section under sse/bridge/ubl jurisdiction and bridge no 91 dn(3x12.20m psc girders, panda river) at km 553/700-800 between dev-svtn stations in dwr-ld) s
For complete deion and other details, please refer to tender
Read moreSw-i:- has-majn section: ancillary works for improvements to road to rub no. 628a at km. 173/400-500 in aden/sklr sub-division. sw-ii:- has - majn section: replacement of existing shallow type girder in bridge no.473 (1x7.310m) at km.129/000-100 with rcc box of size 1x7.50x4.65m between knyr-nrj stations.(rolling/launching method)
For complete deion and other details, please refer to tender
Read moreHubballi division: ubl-kjg section: construction of bridge of size 3x3x34m at km 425/500-700 between ylg-gdi( yelvigi-gudageri ) stations by cut & cover/rh girder method with retaining wall.( maintenance period 03 months)
For complete deion and other details, please refer to tender
Read moreof your Industry type