Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Invitation For Bids: Railway Infrastructure Improvement Project 🛠️ The Ministry Of Railways, Under The Central Government, Invites Bids For The Improvement Of Returning Walls And Approach Roads At Various Locations Within The Hubballi Division, Sw I And Sw Ii, Under The Aden/Central/Ubl Jurisdiction. 🗺️ 📅 Bid Submission Deadline: 24/05/2024, 11:00 Am The Project Encompasses Maintenance Work With A Duration Of 4 Months. Interested Contractors Must Submit A Tender Along With An Earnest Money Deposit (Emd) Of Inr 237,600. For Detailed Specifications, Scope Of Work, And Other Tender Related Information, Please Refer To The Tender Document. Keywords: Railway Infrastructure, Improvement Project, Hubballi Division, Sw I & Sw Ii, Aden/Central/Ubl, Ministry Of Railways, Tender, Emd, Maintenance Period| Particulars | Details |
|---|---|
| Title |
Hubballi Division: Sw I : Improvement To Returning Wall And Approach Road At Lhs/8/D
In Hubli Gadag Section Under Aden/Central/Ubl Jurisdiction. Hubballi Division: Sw Ii: Improvement To Approach Road At Lhs/21/A In Hubli Karajgi (Ubl Kjg) Section And Lhs/9 D Gdg Bdm Section Under Aden/Central/Ubl Jurisdiction. (Maintenance Period=04 Months)
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 74757484 |
|
Reference Number |
04UBL24-25DT260424ITEM-06 |
| Tender Fee | 0 |
| EMD | 2.38 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74757484/viewNitPdf_4546309.pdf |
| Start Date | April 30, 2024 18:29 |
| End Date |
Expired
24/05/2024
Expired 874 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hubballi division: ubl-kjg (hubballi - karjagi): construction of limited height subway [lhs] at km 445/0-100 in saunshi yard (snh) at ubl-kjg section( near br.no-18a) (maintenance period: 04 years)
Hubballi division: ubl-kjg (hubballi - karjagi): construction of limited height subway [lhs] at km 445/0-100 in saunshi yard (snh) at ubl-kjg section( near br.no-18a) (maintenance period: 04 years)
Read moreHubballi division-improvements to approach road for rub 237a at km.482/345 at navalur yard between ubl-ld section. (maintenance period - 12 months).
Hubballi division-improvements to approach road for rub 237a at km.482/345 at navalur yard between ubl-ld section. (maintenance period - 12 months).
Read moreSw-i-construction of new side drains by replacing damaged unserviceable drains- under aden/awb s jurisdiction(total qty=3200 rm) ).(irpsm id11.04.31.25.4.53.006)sw-ii-construction of new side drains by replacing damaged unserviceable drains- under aden/j s jurisdiction.(total qty=4800 rm).( irpsm id 11.04.31.25.4.53.003)sw-iii- construction of new side drains by replacing damaged unserviceable drains- under sse/pway /hnl under aden/pau s jurisdiction.( total qty=4800 rm).( irpsm
Sw-i-construction of new side drains by replacing damaged unserviceable drains- under aden/awb s jurisdiction(total qty=3200 rm) ).(irpsm id11.04.31.25.4.53.006)sw-ii-construction of new side drains by replacing damaged unserviceable drains- under aden/j s jurisdiction.(total qty=4800 rm).( irpsm id 11.04.31.25.4.53.003)sw-iii- construction of new side drains by replacing damaged unserviceable drains- under sse/pway /hnl under aden/pau s jurisdiction.( total qty=4800 rm).( irpsm
Read moreSw-i :- cess repairs/widening work, toe bank,sand or boulder drains under aden/pau s jurisdiction( total qty=65682 cum) .(irpsm id no.11.04.31.25.4.53.002)sw-ii :- cess repairs/widening work, toe bank,sand or boulder drains under aden/j s jurisdiction(total qty= 80852 cum(irpsm id no.11.04.31.25.4.53.008)
Sw-i :- cess repairs/widening work, toe bank,sand or boulder drains under aden/pau s jurisdiction( total qty=65682 cum) .(irpsm id no.11.04.31.25.4.53.002)sw-ii :- cess repairs/widening work, toe bank,sand or boulder drains under aden/j s jurisdiction(total qty= 80852 cum(irpsm id no.11.04.31.25.4.53.008)
Read moreConstruction of rub/lhs in lieu of lc no. 351 at km.688/25-27 between nia-akt under the jurisdiction of aden/central, bilaspur.
Construction of rub/lhs in lieu of lc no. 351 at km.688/25-27 between nia-akt under the jurisdiction of aden/central, bilaspur.
Read moreRaising of bed, improvement of drainage arrangements, joints treatment of lhs & approach of lhs no. 69-a, 69-c, 74-a & 78-a on jhl-hsr section in the section of sse/w/sag under aden/pta.
Raising of bed, improvement of drainage arrangements, joints treatment of lhs & approach of lhs no. 69-a, 69-c, 74-a & 78-a on jhl-hsr section in the section of sse/w/sag under aden/pta.
Read more1) provision of fittings for h-beam sleepers in solapur division.2)replacement of sleepers on bridges using bridge approach and bridge central sleepers under aden/pvr jurisdiction in kwv-mrj section.(re-invitation)
1) provision of fittings for h-beam sleepers in solapur division.2)replacement of sleepers on bridges using bridge approach and bridge central sleepers under aden/pvr jurisdiction in kwv-mrj section.(re-invitation)
Read moreElectrical works for 1) at tsk division: provision of 01 no rub by elimination of l-xing (rm-267) at km 307/5-6 at tsk division. 2) proposed construction of rub/lhs in lieu of lc gate no. rm-282 at km 329/6-7 between section bgnd-gom under the jurisdiction of aden/nlp.3) proposed construction of rub/lhs in lieu of lc gate no. rm-287 at km 340/9-341/0 between section gom-dmc under the jurisdiction of aden/nlp. 4) at tsk division: provision of 01 no rub by elimination of l-xing at rm-290 at tsk
Electrical works for 1) at tsk division: provision of 01 no rub by elimination of l-xing (rm-267) at km 307/5-6 at tsk division. 2) proposed construction of rub/lhs in lieu of lc gate no. rm-282 at km 329/6-7 between section bgnd-gom under the jurisdiction of aden/nlp.3) proposed construction of rub/lhs in lieu of lc gate no. rm-287 at km 340/9-341/0 between section gom-dmc under the jurisdiction of aden/nlp. 4) at tsk division: provision of 01 no rub by elimination of l-xing at rm-290 at tsk
Read moreAt apdj div : electrical work for : provision of cover shed, sump roof and pumping arrangement wall, draining arrangement with return valve, hump at both ends of approach road of lhs/rub & pump house for draining out water logging at lhs/rub in connection with sump/roof cover at br. no. 33/a at km 32/1-2 between rqj-jpe, 56a at km 50/5-6 between nmx -bxya, 66/a at km 61/7-8 between atm-dqg & 104/a at km 94 /2-3 between flk - guz etc under the jurisdiction of sr.den/i/apdj .
At apdj div : electrical work for : provision of cover shed, sump roof and pumping arrangement wall, draining arrangement with return valve, hump at both ends of approach road of lhs/rub & pump house for draining out water logging at lhs/rub in connection with sump/roof cover at br. no. 33/a at km 32/1-2 between rqj-jpe, 56a at km 50/5-6 between nmx -bxya, 66/a at km 61/7-8 between atm-dqg & 104/a at km 94 /2-3 between flk - guz etc under the jurisdiction of sr.den/i/apdj .
Read moreHubballi division: sw-i: hubballi- karajgi- ctr(p)-27.800tkm. sw-ii: isd over loop line in ubl-kjg for a length of 3.6km. sw-ii: isd (increasing sleeper density) over loop line in hubballi-karajgi(ubl-kjg) for a length of 3.6 km.
For complete deion and other details, please refer to tender
Read moreof your Industry type