Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Retaining Wall On Gargoti Pushpanagar Vengrul Vesarde Mani Patgaon Road Mdr 52 Km. 34/400 To 36/600
|
Description |
Construction Of Retaining Wall On Gargoti Pushpanagar Vengrul Vesarde Mani Patgaon Road Mdr 52 Km. 34/400 To 36/600 &Amp#X0d
Taluka Bhudargad, District Kolhapur.&Amp#X0d
|
Organisation | Public Works Region-Pune | State Govt. and UT |
Tender Id | 2025_PWDRP_1160446_1 |
Reference Number |
E Notice No.71 for 2024-2025 |
Tender Fee | 1700 |
EMD | 76000 |
Tender Value | |
Place | Bhudargad |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2018185 |
Start Date | March 13, 2025 14:30 |
End Date |
20/03/2025 ( Expired 52 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreConstruction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec
Construction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec
Read moreConstruction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a / 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj
Construction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a /&#x0d 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj.
Read moreConstruction of service road and slip road between km450.170 to km 471.300 zarap to patradevi section of nh.66 in the state of maharashtra on epc mode
Construction of service road and slip road between km450.170 to km 471.300 zarap to patradevi section of nh.66 in the state of maharashtra on epc mode
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read moreConstruction of new banelli river bridge on km. 10 of the jaspur-dhampur road in bijnor, parallel to old existing bridge, approach roads and protection works in district bijnor.
Construction of new banelli river bridge on km. 10 of the jaspur-dhampur road in bijnor, parallel to old existing bridge, approach roads and protection works in district bijnor.
Read moreof your Industry type