Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Replacement Of Tubes In Vdu3 Heater 131 F102 Pass#2 During Emergency Shutdown
|
Description |
Replacement Of Tubes In Vdu3 Heater 131 F102 Pass#2 During Emergency Shutdown
|
Organisation | Bharat Petroleum Corporation Limited | Public Sector Undertakings |
Tender Id | 2024_BPCL_18687 |
Reference Number |
1000427281 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | As per Tender Document |
Link | https://bpcltenders.eproc.in |
Start Date | November 27, 2024 05:30 |
End Date |
11/12/2024 ( Expired 193 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreUpgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2-lps in the state of madhya pradesh on epc mode
Upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2-lps in the state of madhya pradesh on epc mode
Read moreSupply, fabrication and erection of ss304l and carbon steel piping in block 1 and 2 of frp, frfcf
Supply, fabrication and erection of ss304l and carbon steel piping in block 1 and 2 of frp, frfcf
Read moreEmergent restoration of superstructure and foundation of gairganda bridge including protection work at chainage 2.200 kmp of nh-317 near birpara, in the district of alipurduar, west bengal, during the year 2025-26. phase- ii
Emergent restoration of superstructure and foundation of gairganda bridge including protection work at chainage 2.200 kmp of nh-317 near birpara, in the district of alipurduar, west bengal, during the year 2025-26. phase- ii
Read moreEmergent restoration work for approach and piers of gairganda bridge at chainage 2.200 kmp of nh-317 near birpara, in the district of alipurduar, west bengal, during the year 2025-26. phase-i
Emergent restoration work for approach and piers of gairganda bridge at chainage 2.200 kmp of nh-317 near birpara, in the district of alipurduar, west bengal, during the year 2025-26. phase-i
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreReplacement of cooling towers installed at various underground metro stations of line 2 and 3 in dmrc network.
Replacement of cooling towers installed at various underground metro stations of line 2 and 3 in dmrc network.
Read moreModification/shifting work of 400/220/132 kv lines, restoration of supply in case of collapsed/damaged tower, replacement of tower, stub repairing, resgaging of conductor, replacement of disc insulator etc. in central zone in mp on rate contract
Modification/shifting work of 400/220/132 kv lines, restoration of supply in case of collapsed/damaged tower, replacement of tower, stub repairing, resgaging of conductor, replacement of disc insulator etc. in central zone in mp on rate contract
Read moreof your Industry type