Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Re Construction Of Nh 29 Km 84 To Baghol Link Road
|
| Description |
Re Construction Of Nh 29 Km 84 To Baghol Link Road
|
| Organisation | Chief Engineer PWD Varanasi Zone | State Govt. and UT |
| Tender Id | 2024_CEUVZ_893079_1 |
|
Reference Number |
231/SE Tender/jnp-gzp circle/23 date 23-01-2024 |
| Tender Fee | 2714 |
| EMD | 3.57 Lakh |
| Tender Value | |
| Place | Jaunpur |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1534591 |
| Start Date | February 09, 2024 14:30 |
| End Date |
Expired
15/02/2024
Expired 873 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair of link road hardoi neer road to kataiya. (l-1.10 km)
Repair of link road hardoi neer road to kataiya. (l-1.10 km)
Read moreConstruction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreStrengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreRestoration of landslide affected sections from km 12.800 to km 14.220 of nh-58e (kundal-jhadol section) in the state of rajasthan.
Restoration of landslide affected sections from km 12.800 to km 14.220 of nh-58e (kundal-jhadol section) in the state of rajasthan.
Read moreShort term maintenance of stretch from km. 0.00 to km. 30.000 (assam west bengal border to kachugaon section) as-12, nh-27 in the state of assam.
Short term maintenance of stretch from km. 0.00 to km. 30.000 (assam west bengal border to kachugaon section) as-12, nh-27 in the state of assam.
Read moreSupervision consultancy services for existing nh-312 of janipur to bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of wb
Supervision consultancy services for existing nh-312 of janipur-omarpur-krishnagar-bongaon-bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of west bengal
Read moreConstruction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Read moreof your Industry type