Tender Details
Particulars | Details |
---|---|
Title |
Construction Of H.L. Bridge Over Local Nallah At 4 110 Km On Malidihi To Godalpada Road In The District Of Jharsuguda Under State Plan For The Year 2023 24
|
Description |
Bridge Work
|
Organisation | EIC-CIVIL | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 10000 |
EMD | 7.94 Lakh |
Tender Value | |
Place | JHARSUGUDA |
Link |
AAAAAAAAAA Login to view |
Start Date | November 29, 2024 14:30 |
End Date |
13/12/2024 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreConstruction work of 4-laning of sandalpur to nasrullaganj bypass end pkgi of nh-146b from design km 0.000 to design km 43.250 (dl 43.250 km) under nh(o) in madhya pradesh on hybrid annuity mode
Construction work of 4-laning of sandalpur to nasrullaganj bypass end pkgi of nh-146b from design km 0.000 to design km 43.250 (dl 43.250 km) under nh(o) in madhya pradesh on hybrid annuity mode
Read moreConstruction of 6 - lane elevated structure extension in rayya at km. 420.070 on jalandhar-amritsar section of nh-03 with service road on both sides including approach for rectification of blackspot in the state of punjab on epc mode.
Construction of 6 - lane elevated structure extension in rayya at km. 420.070 on jalandhar-amritsar section of nh-03 with service road on both sides including approach for rectification of blackspot in the state of punjab on epc mode.
Read morePlc of wmm 100 mm wmm 150 mm dbm 60 mm and bc 40 mm thick inclu cleaning of road surface and applying prime and tack coat alongwith road marking as per morth spec bet km 80 to km 86 on sktt rd under 94 rcc 38 brtf of project deepak in hp
Plc of wmm 100 mm wmm 150 mm dbm 60 mm and bc 40 mm thick inclu cleaning of road surface and applying prime and tack coat alongwith road marking as per morth spec bet km 80 to km 86 on sktt rd under 94 rcc 38 brtf of project deepak in hp
Read moreConsultancy services for preparation of dpr for construction lapri tunnel approximate length 2.63 km on budhal mahore gul road including approach road 1.00 km in project sampark
Consultancy services for preparation of dpr for construction lapri tunnel approximate length 2.63 km on budhal mahore gul road including approach road 1.00 km in project sampark
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreConstruction of 4-lane major bridge on ghaghar river including approaches at km. 176/090 of suratgarh -sri ganganagar section of nh-62 in the state of rajasthan on epc mode
Construction of 4-lane major bridge on ghaghar river including approaches at km. 176/090 of suratgarh -sri ganganagar section of nh-62 in the state of rajasthan on epc mode
Read moreEngaging technical consultant for preparation of feasibility study (fs) and detailed project report (dpr) for construction of new road manul-menshithang to nhsl specifications between km 0.00 to km 52.00 through green field alignment in the aor of 10
Engaging technical consultant for preparation of feasibility study (fs) and detailed project report (dpr) for construction of new road manul-menshithang to nhsl specifications between km 0.00 to km 52.00 through green field alignment in the aor of 10
Read moreDevelopment of 4-laning of jagtial karimnagar section of nh-563 from ch.0.000 km (existing chainage 90-500 on nh-63) to ch.58.866 km (near sh-1 ch.170.400 km) at karimnagar bypass end (length 58.866 km) under nh (o) on ham in the state of telangana
Development of 4-laning of jagtial karimnagar section of nh-563 from ch.0.000 km (existing chainage 90-500 on nh-63) to ch.58.866 km (near sh-1 ch.170.400 km) at karimnagar bypass end (length 58.866 km) under nh (o) on ham in the state of telangana
Read moreDevelopment of four laning of armoor (design km.29.100) to jagtial (design km.92.700) for a length of 63.60 kms of nh-63 under nh (o) in the state of telangana on hybrid annuity mode
Development of four laning of armoor (design km.29.100) to jagtial (design km.92.700) for a length of 63.60 kms of nh-63 under nh (o) in the state of telangana on hybrid annuity mode
Read moreof your Industry type