Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Services For Preparation Of Detailed Project Report For Intermediate Lane/2 Lane/2 Lane With Paved Shoulder Configuration Road From Budam To Hundru Fall Via Godadih,Babhni,Tati Singari,Sursu,Harzalum Road
|
| Description |
Consultancy Services For Preparation Of Detailed Project Report For Intermediate Lane/2 Lane/2 Lane With Paved Shoulder Configuration Road From Budam To Hundru Fall Via Godadih,Babhni,Tati Singari,Sursu,Harzalum Road
|
| Organisation | Government of Jharkhand |
| Tender Id | 2023_CECOM_75694_1 |
|
Reference Number |
RCD/FSD/AP/RAN/52/23-24 |
| Tender Fee | 5000 |
| EMD | 0 |
| Tender Value | - |
| Place | CE Comm. RCD JHARKHAND RANCHI |
| Link |
View Original Tender Notice
https://jharkhandtenders.gov.in |
| Start Date | September 11, 2023 22:30 |
| End Date |
Expired
19/09/2023
Expired 1122 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of the descoped 530 m stretch of nh325 from km. 72.065 to 72.595 to two lane with paved shoulders configuration in state of rajasthan.
Development of the descoped 530 m stretch of nh325 from km. 72.065 to 72.595 to two lane with paved shoulders configuration in state of rajasthan.
Read moreConsultancy services for preparation of detailed project report (dpr) and pre-construction activities for widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 80.00 ghat to udiyari bend of nh-309a.
Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 80.00 ghat to udiyari bend of nh-309a in the state of uttarakhand. (length 80 km).
Read moreConsultancy services for preparation of detailed project report dpr and pre-construction activities for widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 235.00 jyolikot to karanprayag of nh-109.
Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 235.00 jyolikot to karanprayag of nh-109 (old nh 87ext) in the state of uttarakhand.(length- 235 km).
Read moreBalance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for proper
Balance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreConsultancy services for preparation of detailed project report (dpr) and pre-construction activities for widening of existing single /intermediate lane to 2-lane with paved shoulder from km. 175.00 to 311.00 (bataghat to maletha) on nh-707a.
Widening of existing single /intermediate lane to 2-lane with paved shoulder from km. 175.00 to 311.00 (bataghat to maletha) on nh-707a in the state of uttarakhand. (length 136 km).
Read moreConsultancy services for preparation of detailed project report (dpr) and pre-construction activities for widening of existing single / intermediate lane to 2- lane with paved shoulder from km 0.00 to km 175.00 (tyuni to bataghat) of nh-707a.
Widening of existing single / intermediate lane to 2- lane with paved shoulder from km 0.00 to km 175.00 (tyuni to bataghat) of nh-707ain the state of uttarakhand. (length-175 km).
Read moreWidening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Read moreUpgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreof your Industry type