Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Performance Based Maintenance Contract (Pbmc) Work On Nh 02 (Old Nh 61) From Km 125.000 To Km 135.000 (Length 10.00 Km) Under Nh Division Ii Mokokchung In The State Of Nagaland
|
Description |
Performance Based Maintenance Contract (Pbmc) Work On Nh 02 (Old Nh 61) From Km 125.000 To Km 135.000 (Length 10.00 Km) Under Nh Division Ii Mokokchung In The State Of Nagaland
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id | 2025_MoRTH_861390_1 |
Reference Number |
NO. CE/NH/NH-61/PBMC/2024-25/127 |
Tender Fee | 10000 |
EMD | 11.91 Lakh |
Tender Value | |
Place | Km 125 to 135 Km |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=905557 |
Start Date | May 23, 2025 21:30 |
End Date |
23/06/2025 ( Expired 13 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Performance based maintenance contract (pbmc) for maintenance of nagaj to muchandi section of nh 166 e from km 0/00 to muchandi section of nh 166 e from km 0/00 to 49/381 km (project length 49.381 km) in the state of maharashtra for 5 years
Performance based maintenance contract (pbmc) for maintenance of nagaj to muchandi section of nh 166 e from km 0/00 to muchandi section of nh 166 e from km 0/00 to 49/381 km (project length 49.381 km) in the state of maharashtra for 5 years
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreIe services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham
Read moreWork of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Read morePerformance based maintenance contract (pbmc) of nh-05 from km 0.00 at crossing sector 34-35 to u.t. boundary km 6.415 and km 0.00 at crossing sector 34-35 to km 8.30 u.t. boundary zirakpur including service lanes except km 3.18 to km 4.83 u.t.
Performance based maintenance contract (pbmc) of nh-05 from km 0.00 at crossing sector 34-35 to u.t. boundary km 6.415 and km 0.00 at crossing sector 34-35 to km 8.30 u.t. boundary zirakpur including service lanes except km 3.18 to km 4.83 u.t
Read moreOperation routine maintenance repair and periodic renewal work of two lane with paved shoulder of raisinghnagar poogal section (101.000 to design ch. 263.460) (l162.46 km) in rajasthan (pkg2) on performance based maintenance contracts (pbmc) mode
Operation routine maintenance repair and periodic renewal work of two lane with paved shoulder of raisinghnagar poogal section (101.000 to design ch. 263.460) (l162.46 km) in rajasthan (pkg2) on performance based maintenance contracts (pbmc) mode
Read moreReconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreof your Industry type