Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
2. Restoration To Devi Left Embankment From Rd 45.665 Km To 45.730 Km
|
| Description |
Restoration To Devi Left Embankment From Rd 45.665 Km To 45.730 Km
|
| Organisation | Government of Odisha |
| Tender Id | 2023_CELBB_98905_2 |
|
Reference Number |
NOTICE No.JSD-19 OF 2023-24 |
| Tender Fee | 6000 |
| EMD | 49500 |
| Tender Value | - |
| Place | O/o the S.E, Jagatsinghpur Irrigation Division |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in |
| Start Date | December 28, 2023 15:30 |
| End Date |
Expired
11/01/2024
Expired 987 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreStmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreProviding bt road from pwd road to ponnagutta thanda (1/0 to 2/0 km) of shankarpally (m) in rangareddy district
Providing bt road from pwd road to ponnagutta thanda (1/0 to 2/0 km) of shankarpally (m) in rangareddy district
Read moreSupply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read more11. restoration to devi left embankment at village balipada from rd 54.00 km to 54.100 km
Restoration to devi left embankment at village balipada from rd 54.00 km to 54.100 km
Read more18. improvement to devi left embankment from rd 57.00 km to 58.00 km
Improvement to devi left embankment from rd 57.00 km to 58.00 km
Read more7. restoration to slipped launching appron on devi left embankment near jetty from rd 80.775 km to 80.8475 km
Restoration to slipped launching appron on devi left embankment near jetty from rd 80.775 km to 80.8475 km
Read moreImprovement to devi left embankment from rd 44.900km to rd 52.360 km and rd 54.765 km to rd 58.000 km.
Road work and construction of guard wall
Read more1) restoration to kushavadra left embankment from rd 9.250 km. to 9.400 km
Restoration to kushavadra left embankment from rd 9.250 km. to 9.400 km
Read moreof your Industry type