Tender Details

Particulars Details
Title
Retaining Wall Work On The Pond In Km 2 Of Aavadugaiya Link Road In Distt. Shahjahanpur. (Fin Year 2023 24)
Description
Retaining Wall Work On The Pond In Km 2 Of Aavadugaiya Link Road In Distt. Shahjahanpur. (Fin Year 2023 24)
Organisation Government of Uttar Pradesh
Tender Id 2023_CEBLY_860188_1
Reference
Number
9865/142C(E-Tender)-3/2023-24 Date 03-11-2023
Tender Fee 2725
EMD 4.01 Lakh
Tender Value
Place SE BLY CIRCLE PWD BLY
Link https://etender.up.nic.in
Start Date November 07, 2023 14:30
End Date

17/11/2023 ( Expired 574 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode

Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode

Read more
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode

Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode

Read more
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise