Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dnit For Rehabilitation Of ...
|
| Description |
Rehabilitation Of Existing Roads By Ready Mix Concrete M 40 With Paver Machinic, Laying Of Sewerage Line, Swd, Footpath From Samrat Meer Bhoj Chowk To Village Kadarpur Road (Dlf 30m Road) Maidawas Village, Ward No. 15 Under Division 1 B, Zone 1, Mc Gu
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2026_HRY_520151_1 |
|
Reference Number |
2026359ECA08 89D5 47A4 99FA E7978CACC29A285ULB |
| Tender Fee | 21000 |
| EMD | 14.9 Lakh |
| Tender Value | |
| Place | Gurugram |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=599040 |
| Start Date | May 07, 2026 22:30 |
| End Date |
Expired
28/05/2026
Expired 54 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for preparation of detailed project report for 4-laning of katra reasi mahore gulabgarh nandimarg to kulgam to nh44 in the ut of j-k
Consultancy services for preparation of detailed project report for 4-laning of katra reasi mahore gulabgarh nandimarg to kulgam to nh44 in the ut of j-k
Read moreAppointment of general consultants for the office of chief administrative officer/ construction, road safety projects, north central railway.
For complete deion and other details, please refer to tender
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreExpression of interest to invite prospective and probable manufactures/suppliers various materials required for manufacturing of different types of parachutes
Expression of interest to invite prospective and probable manufactures/suppliers various materials required for manufacturing of different types of parachutes
Read moreProcurement of control interface module (cim) for 20 cum er shovel
Procurement of control interface module (cim) for 20 cum er shovel
Read moreDesign, engg, supply, erection, testing and comi of dry ash pre con sys for augmentation of ahs sys.
Design, engg, supply, erection, testing and comi of dry ash pre con sys for augmentation of ahs sys.
Read moreWork regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreof your Industry type