Tender Details

Particulars Details
Title
Construction Of Greyveard With Soakpit Near Amdan Health Center Dakhsin At Amdan Amdan Ii
Description
Construction Of Greyveard With Soakpit Near Amdan Health Center Dakhsin At Amdan Amdan Ii
Organisation Zilla Parishad | State Govt. and UT
Tender Id 2025_ZPHD_878971_1
Reference
Number
WB/Purba Medinipur/Panskura-I/Haur GP /NIeT- 003/2025-26 SL-01
Tender Fee 500
EMD 1600
Tender Value
Place haur
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1980712

Start Date July 17, 2025 18:30
End Date
Expired 23/07/2025

Expired 362 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Revamp of bpi-i phase-ii works at awantipur asf

Revamp of bpi-i phase-ii works at awantipur asf

Read more
Augmentation of dry fly ash transportation system at barauni thermal power station, stage-ii (2x250 mw)

Augmentation of dry fly ash&#x0d transportation system&#x0d at&#x0d barauni thermal power station, stage-ii&#x0d (2x250 mw)

Read more
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Construction of drainage at mgr nagar in narasingarayanpettai

Construction of drainage at mgr nagar in narasingarayanpettai

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction of intermediate pumping stations ips including pl of sewer network rising main and allied works at baramulla

Construction of intermediate pumping stations ips including pl of sewer network rising main and allied works at baramulla

Read more
Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode

Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode

Read more
Extension and new construction of staffs quarter and compound wall for p. h. sub-centre at mouza mangi, tq.- pandharkawada, dist.- yavatmal

Extension and new construction of staffs quarter and compound wall for p. h. sub-centre at mouza mangi, tq.- pandharkawada, dist.- yavatmal

Read more
10/hgp/cfc/tide/dr /2024-25 sl-02

Construction of greyveard with soakpit near amdan health center dakhsin at amdan amdan ii gram sansad no haur xiv place j l no 158 plot no 802 157&amp#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise