Tender Details

Particulars Details
Title
Overhauling Of Cw And Rcw Pump During Upcoming Overhauling Of Unit 5 (215 Mw)
Description
Overhauling Of Cw And Rcw Pump During Upcoming Overhauling Of Unit 5 (215 Mw)&Amp#X0d
Organisation THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 14750
Tender Value
Place BTPS, Hooghly
Link

AAAAAAAAAA

Login to view
Start Date June 11, 2025 17:30
End Date

24/06/2025 ( 19 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district

Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district

Read more
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more
Engaging an independent engineer (ie) during operation and maintenance stage and supervision of black spots construction for hyderabad - bangalore section nh-44 contract packages ap-03, ap-04, ap-05 in the state of telangana.

Engaging an independent engineer (ie) during operation and maintenance stage and supervision of black spots construction for hyderabad - bangalore section nh-44 contract packages ap-03, ap-04, ap-05 in the state of telangana.

Read more
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Read more
Repairing of planetary gear box of bowl mill xrp 903 of unit 8 n 9, dtps htps, kasimpur, aligarh

Overhauling, servicing and testing of planetary gear box of bowl mill &amp#x0d xrp 903 of unit-8 and 9, dtps htps, kasimpur, aligarh

Read more
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Read more
Lot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir

Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india

Read more
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Read more
Overhauling of electrical and pneumatic actuators, sadc system, swas system,turbovisory equipments ,hp/lp bypass ,dozing system, flame scanners, igniters, solenoid valves, hot air gate, pneumatic damper/ power cylinder, hydra stepsvibration monitorin

Overhauling of electrical and pneumatic actuators, sadc system, swas system,turbovisoryequipments ,hp/lp bypass ,dozing system, flame scanners, igniters, solenoid valves, hot air gate, pneumatic damper/ power cylinder, hydra steps vibration monitori

Read more
Overhauling of bfp and its booster pump of unit # 3 of 3x210mw,atps,anpara

Overhauling of bfp and its booster pump of unit # 3 of 3x210mw,atps,anpara

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise