Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Bm Aoh 2025 Unit Iii Boiler Pressure Parts Cutting And Removing Of Heavily Wornout Crh And Hrh Tubes Roof Plate And Fabrication And Erection Of New Corten Steel Sheet 3.15mm Thick And Allied Works In The Penthouse Area At 52 Mtr Level
|
| Description |
Mtps I Bm Aoh 2025 Unit Iii Boiler Pressure Parts Cutting And Removing Of Heavily Wornout Crh And Hrh Tubes Roof Plate And Fabrication And Erection Of New Corten Steel Sheet 3.15mm Thick And Allied Works In The Penthouse Area At 52 Mtr Level
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_621935_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / BM /OT. 365 / 2025-26 |
| Tender Fee | 0 |
| EMD | 7900 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=743628 |
| Start Date | November 10, 2025 21:30 |
| End Date |
Expired
24/11/2025
Expired 327 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i bm aoh 2025 unit iv boiler pressure parts cutting and removing of heavily worn out crh and hrh tubes roof plate and fabrication and erection of new hr sheet and allied works in the penthouse area at 52 mtr level
Mtps i bm aoh 2025 unit iv boiler pressure parts cutting and removing of heavily worn out crh and hrh tubes roof plate and fabrication and erection of new hr sheet and allied works in the penthouse area at 52 mtr level
Read moreMtps i bm aoh 2026 unit i boiler pressure parts replacing overheated hrh stub bends and other circuit bends at penthouse area and allied works
Mtps i bm aoh 2026 unit i boiler pressure parts replacing overheated hrh stub bends and other circuit bends at penthouse area and allied works
Read moreMtps i bm aoh 2024 unit i boiler pressure parts-replacing overheated hrh stub bends and other circuit bends at penthouse area and allied works
Mtps i bm aoh 2024 unit i boiler pressure parts-replacing overheated hrh stub bends and other circuit bends at penthouse area and allied works
Read moreMtps i bm aoh 2025 unit i boiler pressure parts replacing overheated hrh stub bends and other circuit bends at penthouse area and allied works
Mtps i bm aoh 2025 unit i boiler pressure parts replacing overheated hrh stub bends and other circuit bends at penthouse area and allied works
Read moreMtps i bm aoh 2025 unit i boiler pressure parts cutting and removing of heavily wornout rear arch room roof plate supply fabrication and erection of hr sheet at rear arch room and allied works
Mtps i bm aoh 2025 unit i boiler pressure parts cutting and removing of heavily wornout rear arch room roof plate supply fabrication and erection of hr sheet at rear arch room and allied works
Read moreMtps i chp i replacement of existing heavily damaged wornout drive bed frame structures with bed foundation in wagon tippler ii
Mtps i chp i replacement of existing heavily damaged wornout drive bed frame structures with bed foundation in wagon tippler ii&#x0d &#x0d
Read moreMtps i bm unit i fabrication of hrh header bends and coil circuit bends at pent house area for aoh 2024
Mtps i bm unit i fabrication of hrh header bends and coil circuit bends at pent house area for aoh 2024
Read moreMtps i bm unit i fabrication of hrh header bends and coil circuit bends at pent house area for aoh 2025
Mtps i bm unit i fabrication of hrh header bends and coil circuit bends at pent house area for aoh 2025
Read moreMtps i bm unit iv boiler pressure parts aoh 2024 supply and installation of air sealants to avoid ash leakage in pent house at psh crh hrh and fsh areas air ingression in the boiler and allied works
Mtps i bm unit iv boiler pressure parts aoh 2024 supply and installation of air sealants to avoid ash leakage in pent house at psh crh hrh and fsh areas air ingression in the boiler and allied works
Read moreResidual life assessment (rla) study of critical piping (i.e. ms, crh, hrh, hp and lp bypass line, feed water station, crh to deaerator and hp heater etc) related to turbine side of unit no. 1,2 and 3 (210mw), mtps, dvc, bankura
Residual life assessment (rla) study of critical piping (i.e. ms,
 crh, hrh, hp and lp bypass line, feed water station, crh to deaerator and hp heater etc)
 related to turbine side of unit no. 1,2 and 3 (210mw), mtps, dvc, bankura
Read moreof your Industry type