Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Bm Aoh 2025 Unit Iv Boiler Pressure Parts Cutting And Removing Of Heavily Worn Out Crh And Hrh Tubes Roof Plate And Fabrication And Erection Of New Hr Sheet And Allied Works In The Penthouse Area At 52 Mtr Level
|
| Description |
Mtps I Bm Aoh 2025 Unit Iv Boiler Pressure Parts Cutting And Removing Of Heavily Worn Out Crh And Hrh Tubes Roof Plate And Fabrication And Erection Of New Hr Sheet And Allied Works In The Penthouse Area At 52 Mtr Level
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_589357_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / BM /OT.233/ 2025-26 |
| Tender Fee | 0 |
| EMD | 7200 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=704042 |
| Start Date | August 05, 2025 23:00 |
| End Date |
Expired
19/08/2025
Expired 420 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i bm unit ii boiler pressure parts aoh 2026 maintenance of burners and replacement of worn out fasteners at cover plates
Mtps i bm unit ii boiler pressure parts aoh 2026 maintenance of burners and replacement of worn out fasteners at cover plates
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in water wall area s panel area water wall reducer tubes inter pass area etc
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in water wall area s panel area water wall reducer tubes inter pass area etc
Read moreMtps i bm unit ii boiler aoh 2026 reconditioning and hard facing of used and worn out coal nozzles fixing of divider plates and allied works
Mtps i bm unit ii boiler aoh 2026 reconditioning and hard facing of used and worn out coal nozzles fixing of divider plates and allied works
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in ltsh coils economizer hanger tubes steam cooled side walls and fin welding in boiler iind pass area
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in ltsh coils economizer hanger tubes steam cooled side walls and fin welding in boiler iind pass area
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification of worn out lines and bends of ibd and low point drain lines atomizing steam drain lines etc
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification of worn out lines and bends of ibd and low point drain lines atomizing steam drain lines etc
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification of buck stay beam and supports renewal of worn out buck stay pin fabrication of buck stay cover etc
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification of buck stay beam and supports renewal of worn out buck stay pin fabrication of buck stay cover plate etc in ist and ii nd pass area and rectification of critical pipe line of crh etc
Read moreMtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh
Mtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in 7.9m s panel bend and side water wall tube in boiler 1st pass
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in 7.9m s panel bend and side water wall tube in boiler 1st pass
Read moreMtps i tm unit ii carrying out bullet cleaning by specially designed phosphor bronze bullet shot of lhs and rhs of condenser tubes in condenser during aoh of 2026 27
Mtps i tm unit ii carrying out bullet cleaning by specially designed phosphor bronze bullet shot of lhs and rhs of condenser tubes in condenser during aoh of 2026 27
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 reconditioning and hard facing of used and worn out square coal nozzle tips including ss309 plates and checking of deformation and matching with nozzle
Mtps i bm unit ii boiler pressure parts aoh 2026 reconditioning and hard facing of used and worn out square coal nozzle tips including ss309 plates and checking of deformation and matching with nozzle
Read moreof your Industry type