Particulars | Details |
---|---|
Title |
Mtps I Bm Aoh 2025 Unit I Boiler Pressure Parts Cutting And Removing Of Heavily Wornout Rear Arch Room Roof Plate Supply Fabrication And Erection Of Hr Sheet At Rear Arch Room And Allied Works
|
Description |
Mtps I Bm Aoh 2025 Unit I Boiler Pressure Parts Cutting And Removing Of Heavily Wornout Rear Arch Room Roof Plate Supply Fabrication And Erection Of Hr Sheet At Rear Arch Room And Allied Works
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_564105_1 |
Reference Number |
CE / MTPS-I / SE / M-I / BM /OT.116/ 2025-26 |
Tender Fee | 0 |
EMD | 11400 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=673507 |
Start Date | June 02, 2025 22:30 |
End Date |
16/06/2025 ( Expired 12 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i bm unit i to iv boiler pressure parts safety valve floating during aoh 2025
Mtps i bm unit i to iv boiler pressure parts safety valve floating during aoh 2025
Read moreMtps i mill plant ac plant unit iii aoh 2025 26 air washer system epoxy painting of blowers and its auxiliaries enamel painting of awcw pumps pipe lines spray nozzles flushing works overhauling the blower 3a 3b damper box awcw pumps and gate valves
Mtps i mill plant ac plant unit iii aoh 2025 26 air washer system epoxy painting of blowers and its auxiliaries enamel painting of awcw pumps pipe lines spray nozzles flushing works overhauling the blower 3a 3b damper box awcw pumps and gate valves
Read moreMtps i bm unit i aoh 2025 26 flue gas duct a and b sides patch up works and other repair works between aph out let to esp inlet
Mtps i bm unit i aoh 2025 26 flue gas duct a and b sides patch up works and other repair works between aph out let to esp inlet
Read moreMtps i bm unit i aoh 2025 26 fg duct a and b sides renewal of deflector plates renewal of duct supports renewal of guard plates over the expansion joints etc
Mtps i bm unit i aoh 2025 26 fg duct a and b sides renewal of deflector plates renewal of duct supports renewal of guard plates over the expansion joints etc
Read moreMtps i bm unit i aoh 2025 26 replacement of the worn out shaft and other related works in pa fan 1a
Mtps i bm unit i aoh 2025 26 replacement of the worn out shaft and other related works in pa fan 1a
Read moreMtps i bm aoh 2025 26 unit i complete overhaul of aph a and b sides and other related works
Mtps i bm aoh 2025 26 unit i complete overhaul of aph a and b sides and other related works
Read moreMtps i bm unit i boiler pressure parts aoh 2025 disposal of ash from pent house eco hopper deflection slope rear arch room and boiler roof area strengthening of eco hopper supports with new pipes and allied works
Mtps i bm unit i boiler pressure parts aoh 2025 disposal of ash from pent house eco hopper deflection slope rear arch room and boiler roof area strengthening of eco hopper supports with new pipes and allied works
Read moreRepair of ceiling, joinery, tiling, pcc, roof sheet and allied works at central amenity, noi, utility center and certain small unit in the aor of age b/r-i under ge narangi
Repair of ceiling, joinery, tiling, pcc, roof sheet and allied works at central amenity, noi, utility center and certain small unit in the aor of age b/r-i under ge narangi
Read moreMtps i bm unit i boiler pressure parts aoh 2025 rectification of buck stay beam and supports renewal of wornout buck stay pin fabrication of buck stay cover plate etc in ist and ii nd pass area and allied works
Mtps i bm unit i boiler pressure parts aoh 2025 rectification of buck stay beam and supports renewal of wornout buck stay pin fabrication of buck stay cover plate etc in ist and ii nd pass area and allied works
Read moreMtps i bm aoh 2025 unit i boiler pressure parts cutting and removing of heavily wornout rear arch room roof plate supply fabrication and erection of hr sheet at rear arch room and allied works
Mtps i bm aoh 2025 unit i boiler pressure parts cutting and removing of heavily wornout rear arch room roof plate supply fabrication and erection of hr sheet at rear arch room and allied works
Read moreof your Industry type