Tender Details
Particulars | Details |
---|---|
Title |
Fowler Bed With Mattress And Iv Poll,Foot Table,Bed Side Locker,Over Bed Table,Attendant Bed,Attend
|
Description |
|
Organisation | WAPCOS Limited | Ministry of Water Resources River Development and Ganga Rejuvenation |
Tender Id | GEM/2024/B/5430699 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | September 23, 2024 22:35 |
End Date |
08/10/2024 ( Expired 244 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreShelter part,single bed hard with mattress,table bed side,chair writing,writing table,centre table,
Read more
Shelter part,double sleeping bunk with matteress,bed side locker large,chair writing,writing table,
Read more
Visitor chair 3 seater vs,office table ot,office chair oc,icu bed with mattress b,bed side locker q
Read more
Doble bed,bed side table,high back chair,centre table,outdoor deck furniture,cup board with sliding
Read more
Wooden king size bed with hydraulic,table bed side wooden,executive sofa chair 3 seater,table centr
Read more
Fowler bed with mattress,bed side locker,over bed table,patient stool,slaine stand,wheel chair,inst
Read more
Aiho bridge over river tangon at 13th km of malda bulbulchandi road, rehabilitation of both side approach slab with abutment wall portion and other allied works under malda highway division in the district of malda.
Aiho bridge over river tangon at 13th km of malda bulbulchandi road, rehabilitation of both side approach slab with abutment wall portion and other allied works under malda highway division in the district of malda.
Read more1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material,
1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material
Read moreConstruction of side wall with girder support along with erection of goal post girder support, bolting of roof after dressing and fixing of crown cog by concrete sleeper in dishergarh (r-iv) seam of satgram project
Construction of side wall with girder support along with erection of goal post girder support, bolting of roof after dressing and fixing of crown cog by concrete sleeper in dishergarh (r-iv) seam of satgram project
Read moreof your Industry type