Tender Details

Particulars Details
Title
Consultancy Services For Preparation Of Detailed Project Report For 2 Lane With Paved Shoulder Configuration Road For Subhash Chowk To Lc Road Chowk Bazaar(nh80) Via Dy Collectorate, Jail And Nh 80 Road From Urban Part Ghormara Bridge To Saksharat
Description
Consultancy Services For Preparation Of Detailed Project Report For 2 Lane With Paved Shoulder Configuration Road For Subhash Chowk To Lc Road Chowk Bazaar(nh80) Via Dy Collectorate, Jail And Nh 80 Road From Urban Part Ghormara Bridge To Saksharat
Organisation Government of Jharkhand
Tender Id 2023_CECOM_72732_1
Reference
Number
RCD/FSD/AP/DUM/11/2023-24
Tender Fee 5000
EMD 0
Tender Value -
Place CE Comm. RCD Jharkhand Ranchi
Link
View Original Tender Notice

https://jharkhandtenders.gov.in

Start Date June 21, 2023 22:30
End Date
Expired 03/07/2023

Expired 1199 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).

Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).

Read more
Construction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode

Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km

Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km

Read more
Widening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh

Widening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh

Read more
Balance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for proper

Balance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).

Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).

Read more
Construction of cement concrete road of 2 lane with paved shoulder configuration from km. 168.180 shitala mata mandir to km 168.920 railway crossing total length - 740 m on bhandara-khat-ghotitok road nh-247 in the state of maharashtra

Construction of cement concrete road of 2 lane with paved shoulder configuration from km. 168.180 shitala mata mandir to km 168.920 railway crossing total length - 740 m on bhandara-khat-ghotitok road nh-247 in the state of maharashtra

Read more
Up gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra

Up gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise