Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Improvement To Left Dyke Link Road From Rd4606.69m To Rd5029.19m,1st Gap Toe Road From Rd1245m To Rd1545m, Link Road Of 5th Gap To Air Strip,Toe Road Of 5th Gap Alongwith Its Ramp And Colony Road Of Hirakud And Jamadarpali Section For The Year2023 24
|
Description |
Improvement To Left Dyke Link Road From Rd4606.69m To Rd5029.19m,1st Gap Toe Road From Rd1245m To Rd1545m, Link Road Of 5th Gap To Air Strip,Toe Road Of 5th Gap Alongwith Its Ramp And Colony Road Of Hirakud And Jamadarpali Section For The Year2023 24
|
Organisation | Government of Odisha |
Tender Id | 2023_CEBBU_93231_1 |
Reference Number |
HHW AND ASC-01/2023-24 |
Tender Fee | 10000 |
EMD | 1.7 Lakh |
Tender Value | |
Place | Office of the ACE HHWANDASC |
Link | https://tendersodisha.gov.in |
Start Date | August 28, 2023 16:30 |
End Date |
13/09/2023 ( Expired 647 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Read moreConsultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh 913 koloriang to sarli km 168.0 to 183.40 15.40 km and sarli to huri km 0.00 to 78.38 78.38km
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh 913 koloriang to sarli km 168.0 to 183.40 15.40 km and sarli to huri km 0.00 to 78.38 78.38km
Read moreRectification of 01 nos. blackspots (bhutpura) on chittorgarh udaipur section and construction of new 2l elevated ramp at debari interchange on chittorgarh udaipur road section to provide connection from chittorgarh to pindwara
Rectification of 01 nos. blackspots (bhutpura) on chittorgarh udaipur section and construction of new 2l elevated ramp at debari interchange on chittorgarh udaipur road section to provide connection from chittorgarh to pindwara
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreImprovement of link road from horna hordoo to wasser via malikpora by way of grade ii, grade- ii, 50 mm bm and 25 mm sdbc l1.20 km
Improvement of link road from horna hordoo to wasser via malikpora by way of grade ii, grade- ii, 50 mm bm and 25 mm sdbc l1.20 km
Read moreRfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Read moreRfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Read moreRepairing of pipe line used for supply of water from 6 pit bararee to 1 no. colony and bazar dhowra under bararee section total section of pipeline to be repaired damaged and worn out pipe is 120 mrt 4 inch dia m.s. pipe and changing/replace 4 in
Repairing of pipe line used for supply of water from 6 pit bararee to 1 no. colony and bazar dhowra under bararee section total section of pipeline to be repaired damaged and worn out pipe is 120 mrt 4 inch dia m.s. pipe and changing/replace 4 in
Read moreConstruction of road from kharmunda to amlipali via rnipali, amjore, rujhenmal road in the district of bargarh under mmsy transferred road improvement programme mmsy-trip for the year 2023-24
Construction of road from kharmunda to amlipali via rnipali, amjore, rujhenmal road in the district of bargarh under mmsy transferred road improvement programme mmsy-trip for the year 2023-24
Read moreConst. of inspection chamber, raising of manhole and laying of sewer line for commissioning of s/s laid by owssb through ecci at nuasahi canal road near siba sakti club to main road nh side in connection with s/s, under watco section ggp colony, bbsr
Const. of inspection chamber, raising of manhole and laying of sewer line for commissioning of s/s laid by owssb through ecci at nuasahi canal road near siba sakti club to main road nh side in connection with s/s, under watco section ggp colony, bbsr
Read moreof your Industry type