Tender Details

Particulars Details
Title
Construction Of New Six Lane Access Controlled Capital Region Ring Road From Rameshwar (Nh 16) To Bilipada From Km 0.000 To Km 40.700 In The State Of Odisha Under Nh(o) On Hybrid Annuity Mode (Package 1)
Description
Construction Of New Six Lane Access Controlled Capital Region Ring Road From Rameshwar (Nh 16) To Bilipada From Km 0.000 To Km 40.700 In The State Of Odisha Under Nh(o) On Hybrid Annuity Mode (Package 1)
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 1.8 Lakh
EMD 17.15 Crore
Tender Value
Place NHAI HQ
Link

AAAAAAAAAA

Login to view
Start Date November 22, 2024 23:30
End Date

24/04/2025 ( 4 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.

Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.

Read more
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km

Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km

Read more
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode

Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Read more
Widening to 4 lane of nh-20 (old nh-75e) from km 16.400 to km 47.700 (tupudana to kundibartoli) in the state of jharkhand (total length 31.300 km) on hybrid annuity mode.

Widening to 4 lane of nh-20 (old nh-75e) from km 16.400 (design chainage) to km&#x0d 47.700 (design chainage(tupudana to&#x0d kundibartoli) in the state of jharkhand&#x0d (total length 31.300 km) on hybrid annuity&#x0d mode.&#x0d

Read more
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24

Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24

Read more
Independent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.

Independent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise