Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Annual Maintenance For The Year 2026 27 On Sidhwan To Godigad Road Km.0/0 To 8/0
|
| Description |
Providing And Laying Tack Coat, Bituminous Concrete 30mm Thick And Road Marking With Hot Applied Thermoplastic Compound In Km.0/0 To 1/0 And 3/0 To 4/0
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2026_PWD_132807_10 |
|
Reference Number |
16977-17016 |
| Tender Fee | 2000 |
| EMD | 56000 |
| Tender Value | - |
| Place | Sidhwan |
| Link |
View Original Tender Notice
https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=196396 |
| Start Date | March 30, 2026 14:30 |
| End Date |
Expired
06/04/2026
Expired 172 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rblisp liftii operation and maintenance of rblis lift-ii stage-i pumping station at thirumalayapally (v), madanapur (m) and stage-ii pumping station at kothakota (v,m), wanaparthy (dist) for the year 2026-27 (from 01.10.2026 to 30.09.2027)
Rblisp liftii operation and maintenance of rblis lift-ii stage-i pumping station at thirumalayapally (v), madanapur (m) and stage-ii pumping station at kothakota (v,m), wanaparthy (dist) for the year 2026-27 (from 01.10.2026 to 30.09.2027)
Read moreOperation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreOperation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreRrd on sidhwan to godigad road km.0/00 to 8/00
Construction of pcc retaining wall at rd-3/115 to 3/127 and improvement of damaged road portion at various reaches).(under pdna)
Read moreConstruction of sidhwan godigad upto thanicher road km.0-0 to 8-0
Construction of retaining wall at rd-07-370 to 7-382 and 7-610 to 7-620
Read moreAnnual repair and maintenance of various roads under banjar sub division i.e. naglari sarchi road km.0-0 to 16-500 sidhwan godigad road km.0-0 to 8-0 and manglore panihar road km 0-0 to 8-0
Repair of pot holes
Read moreAnnual maintenance for the year 2026-27 on jibhi bahu gadagushaini road km.0/0 to 20/0
Providing and laying tack coat, bituminous concrete 30mm thick and road marking with hot applied thermoplastic compound in km.6/0 to 7/0 and 7/0 to 8/0)
Read moreAnnual maintenance plan for the year 2026 27 on link road to village baral km 0 0 to 0 585
Sh pl 25mm thick bituminous concrete wet mix macadam and road side u shape drain
Read moreAnnual maintenance plan ofor 2026-27 of kiaroo to guthandhar road km 0/0 to 8/00
Providing ald laying renewal coat using bituminious concrete 30mm thick including rectification of road surface at rd 0/0 to 2/0 village road
Read moreAnnual maintenance plan for the year 2026-27 for damrog to jatoli ashram km 0/0 to 0/700 vr
Providing and laying renewal coat by proving 30 mm thick bituminous concrete in km 0/0 to 0/700
Read moreof your Industry type