Tender Details

Particulars Details
Title
Block For Horn 3 Drawing No. M/P/526 Sheet 1 Of 2,Block For Horn 2 Drawing No. M/P/526 Sheet 2
Description
Organisation Steel Authority of India Limited | Ministry of Steel
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee
EMD
Tender Value
Place
Link

AAAAAAAAAA

Login to view
Start Date May 27, 2025 23:03
End Date

06/06/2025 ( 6 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Tender Result
Tender Status: Active
Additional Information:
Buyer Details
Name: Sudeep Bir Dutta
Address: Sudeep Bir Dutta,[email protected],SAIL REFRACTORY UNIT BHILAI , MARAUDA, P.O. CIVIC CENTRE, BHILAI,Durg,CHHATTISGARH,490006,India
Ministry: Ministry Of Steel
Department: Steel Authority Of India Limited
Organisation: Sail Refractory Unit
Office Address: Sru Sail
Similar Tenders
Phase-2 - driver and final stage amplifiers for 2 sets of

Phase-2 - driver and final stage amplifiers for 2 sets of&#x0d iter icrf sources

Read more
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Read more
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Read more
Selection of project management company (pmc) for project management consultancy services (pmcs) and detailed design consultant (ddc) for chennai metro rail phase 1 network capacity enhancement project

Selection of project management company (pmc) for project management consultancy services (pmcs) and detailed design consultant (ddc) for chennai metro rail phase 1 network capacity enhancement project

Read more
Overhauling of medium pressure pumps unit drain tank unit flash tanks hot well cleaning, overhauling of working oil and lub oil coolers of bfps of unit no.3 3x210mw of atps, anpara.

Overhauling of medium pressure pumps unit drain tank unit flash tanks hot well cleaning, overhauling of working oil and lub oil coolers of bfps of unit no.3 3x210mw of atps, anpara.

Read more
Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority

Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority

Read more
Construction of retaining wall for p-1185 at rr site, kota, rajasthan

Construction of retaining wall for p-1185 at rr site, kota, &#x0d rajasthan

Read more
Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll

Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll

Read more
Construction of engineering hall-1 (back-end facility for lwr - llwmp)

Construction of engineering hall-1 (back-end facility for lwr - llwmp) and other miscellaneous works at barc, visakhapatnam, a.p.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise