Tender Details

Particulars Details
Title
Construction Of Ambikapur Bypass From Sanjaynagar To Rajpuri Khurd On Ambikapur Ramanujganj Garhwa Road Of Nh353 To Two Lane With Paved Shoulder Configuration On Epc Mode In The State Of Chhattisgarh
Description
Construction Of Ambikapur Bypass From Sanjaynagar To Rajpuri Khurd On Ambikapur Ramanujganj Garhwa Road Of Nh353 To Two Lane With Paved Shoulder Configuration On Epc Mode In The State Of Chhattisgarh
Organisation Central Public Procurement Portal 1
Tender Id 2023_MoRTH_763722_1
Reference
Number
18/CE/NH/TC/44-18/2023
Tender Fee 23600
EMD 1.3 Crore
Tender Value -
Place CE, NH Zone, PWD, Raipur
Link
View Original Tender Notice

https://eprocure.gov.in

Start Date August 21, 2023 20:30
End Date
Expired 21/09/2023

Expired 1123 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Performance base maintenance works (pbmc) on section from km 57.600 to 80.600 of ambikapur ramanujganj garhwa road n.h-343 in the state of chhattisgarh

Performance base maintenance works (pbmc) on section from km 57.600 to 80.600 of ambikapur ramanujganj garhwa road n.h-343 in the state of chhattisgarh

Read more
Construction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode

Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Consultancy services for preparation of dpr for i widening upgradation to two lane with paved shoulder on nh 169a from km. 30.75 to km. 51.60 agumbe ghat, ii construction of two lane with paved shoulder for thirtahalli bypass starts on from nh169a

Consultancy services for preparation of dpr for i widening upgradation to two lane with paved shoulder on nh 169a from km. 30.75 to km. 51.60 agumbe ghat, ii construction of two lane with paved shoulder for thirtahalli bypass starts on from nh169a

Read more
Abilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas

Abilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas

Read more
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode

Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.

Read more
Construction of 4 lane with paved shoulder daudnagar bypass from km 93.915 to km 102.290 of nh 139 on naubatpur _ hariharganj road in the state of bihar on epc mode.

Construction of 4 lane with paved shoulder daudnagar bypass from km 93.915 to km 102.290 of nh 139 on naubatpur _ hariharganj road in the state of bihar on epc mode.

Read more
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km

Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km

Read more
Widening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh

Widening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh

Read more
Balance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for proper

Balance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise