Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wbiw/Ee Ii/Dcd/E Nit6/24 25 L1
|
| Description |
Support Service For Cutting An Uprooting Of Jungle, Cleaning Of Office Campus Of Galsi (I) Talit (I), Palar (I), Balgona (I), Ama(i) And Banpas (1) Section Of D.C. No Iii Sub Division Under D.C Division For A Period Of 180 Days ( 15th July24 To
|
| Organisation | IRRIGATION AND WATERWAYS DEPT. | State Govt. and UT |
| Tender Id | 2024_IWD_699941_1 |
|
Reference Number |
WBIW/EE-II/DCD/eNIT-06/24-25 |
| Tender Fee | 0 |
| EMD | 8808 |
| Tender Value | - |
| Place | PURBA BARDHAMAN |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1525757 |
| Start Date | June 28, 2024 14:30 |
| End Date |
Expired
05/07/2024
Expired 821 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreWbiw/ee-ii/dcd/enit01/24-25sl1
Urgent palliative work to the right bank of river bhagirathi at d/s of kalna jetty ghat at kalna municipality, dist.- purba bardhaman for a length of 180.0 m under damodar canal division.&#x0d &#x0d
Read moreWbiw/ee-ii/dcd/enit15/24-25sl1
Hyacinth clear in river brahmani in places in village simulgachi,g.psingi, block-katwa ii to slove water logging problem under ee-ii,damodar canal division
Read moreWbiw/ee-ii/dcd/enit31/24-25sl5
M/r to toe protection to the left bank of river bhagirathi at u/s of existing boulder pitching for a length of 120.0 m. in mouza-gopipur, g.p.-mertala, block- purbasthali-ii, p.s.- purbasthali under damodar canal division
Read moreWbiw/ee-ii/dcd/enit-2/24-25sl2
Urgent palliative work to the right bank of river bhagirathi near military ghat at kalna municipality, dist.- purba bardhaman for a length of 100.0 m under damodar canal division
Read moreWbiw/ee-ii/dcd/enit-9/24-25sl1
Emergent toe protection work to the left bank of river bhagirathi near jhaudanga brahmanitala for a length of 25.00 m. in g.p.- jhaudanga, block-purbasthali-il, p.s - purbasthali under damodar canal division
Read moreWbiw/ee-ii/dcd/enit-26/23-24
Support service and uprooting of jungle, cleaning of office campus of galsi (1), talit (1) palar (1), balgona (1), amarun (i) and banpas (1) section of d.c. no-iii sub-division under d.c division for a period of six months(2nd call).
Read moreWbiw/ee-ii/dcd/enit31/23-24sl2
Soil investigation for the proposed construction of a new cart bridge at ch.514.00 of dabc under dc no-iii sub-division of damodar canal division,block-aushgram-i,p.s.-aushgram, district-purba bardhaman
Read moreWbiw/ee-ii/dcd/enit33/23-24sl1
Maintenance , repair of khalasi shed at ch. 173.00, ch. 316.00 , ch. 541.00 of damodar branch canal under galsi (i) section of d.c.no.-iii sub-division under d.c.division at block- galsi-i , ausgram-i, district-purba bardhaman
Read moreof your Industry type