Tender Details
Particulars | Details |
---|---|
Title |
Wbiw/Ee Ii/Dcd/E Nit31/24 25 Sl5
|
Description |
M/R To Toe Protection To The Left Bank Of River Bhagirathi At U/S Of Existing Boulder Pitching For A Length Of 120.0 M. In Mouza Gopipur, G.P. Mertala, Block Purbasthali Ii, P.S. Purbasthali Under Damodar Canal Division
|
Organisation | IRRIGATION AND WATERWAYS DEPT. | State Govt. and UT |
Tender Id | 2025_IWD_827846_15 |
Reference Number |
WBIW/EE-II/DCD/eNIT-31/2024-25 |
Tender Fee | 0 |
EMD | 33326 |
Tender Value | |
Place | PURBA BARDHAMAN |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1843988 |
Start Date | March 20, 2025 14:30 |
End Date |
03/04/2025 ( Expired 17 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Niet no. - 52 of the fy 2024-2025 of the ee/bqa, phe dte.(sl.no-01)
Restoration of work (for temporary and final closer) of a ghogh over the left bank of the kotulpur branch canal below the phe pipe line in between ch. 600.00 to 615.00 in mouza-hariharchak, g.p- mirjapur,p.s and block- kotulpur, dist- bankura
Read moreBank protection work of river bank right side of barge from 0.00 to 22.50 m at balua pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by e
Bank protection work of river bank right side of barge from 0.00 to 22.50 m at balua pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by e
Read moreBank protection work of river bank from 0.00 m to 20.00 m at sogai pump canal including all cost of material (excluding cement ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.
Bank protection work of river bank from 0.00 m to 20.00 m at sogai pump canal including all cost of material (excluding cement ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.
Read moreFdr-(2024-25) - repairs to breach km 0.230, 0.280, 1.960 and 4.870 r/s on existing bank of tungabandam canal under tower sluice of pakhala lake ashoknagar (v), khanapur (m), warangal district.
Fdr-(2024-25) - repairs to breach km 0.230, 0.280, 1.960 and 4.870 r/s on existing bank of tungabandam canal under tower sluice of pakhala lake ashoknagar (v), khanapur (m), warangal district.
Read moreFdr-(2024-25) - repairs to breach km 2.500, 3.200, 6.300, 8.000 and 13.000 l/s on existing bank of jalubandam canal under tower sluice of pakhala lake, ashoknagar (v), khanapur (m), warangal district.
Fdr-(2024-25) - repairs to breach km 2.500, 3.200, 6.300, 8.000 and 13.000 l/s on existing bank of jalubandam canal under tower sluice of pakhala lake, ashoknagar (v), khanapur (m), warangal district.
Read moreFdr-(2024-25) repairs to breach km 9.610 and 11.000 r/s on existing bank of tungabandam canal under tower sluice of pakhala lake, ashokangar (v), khanapur (m), warangal district.
Fdr-(2024-25) repairs to breach km 9.610 and 11.000 r/s on existing bank of tungabandam canal under tower sluice of pakhala lake, ashokangar (v), khanapur (m), warangal district.
Read moreFdr-(2024-25) - repairs to breach km 4.500 5.200 r/s on existing bank of tungabandam canal under tower sluice of pakhala lake ashoknagar (v), khanapur (m), warangal district.
Fdr 2024-25 - repairs to breach at km 4.500 and 5.200 r/s on existing bank of tungabandam canal under tower sluice of pakhala lake ashoknagar (v), khanapur (m), warangal district.
Read moreFdr-(2024-25) repairs to breach km 0.100 r/s on existing bank khanapur branch canal km 2.650 r/s on existing bank kakulaguddala canal of sangam canal - ii under the sangam sluice of pakhala lake, ashoknagar (v), khanapur (m), warangal district.
Fdr-(2024-25) repairs to breach km 0.100 r/s on existing bank khanapur branch canal km 2.650 r/s on existing bank kakulaguddala canal of sangam canal - ii under the sangam sluice of pakhala lake, ashoknagar (v), khanapur (m), warangal district.
Read moreFdr-(2024-25) repairs to breach km 8.910 9.000 r/s on existing bank of tungabandam canal under tower sluice of pakhala lake, ashoknagar (v), khanapur (m), warangal district.
Fdr-2024-25 repairs to breach at km 8.910 and 9.000 r/s on existing bank of tungabandam canal under tower sluice of pakhala lake, ashoknagar (v), khanapur (m), warangal district.
Read moreFdr-(2024-2025)- repairs to breach km 9.350 l/s km 10.150 r/s on existing bank of sangam canal under sangam sluice of pakahala lake, ashoknagar (v), khanapur (m), warangal district.
Fdr - (2024-2025)- repairs to brach km 9.350 l/s km 10.150 r/s on existing bank of sangam canal under sangam sluice of pakahala lake, ashoknagar (v), khanapur (m), warangal district.
Read moreof your Industry type