Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Bridge Over Hinjuli Nallah At 1st Km On Pwd Road Thianal Road In The District Of Deogarh Under Bsy For The Year 2022 23.
|
| Description |
Construction Of Bridge Over Hinjuli Nallah At 1st Km On Pwd Road Thianal Road In The District Of Deogarh Under Bsy For The Year 2022 23.
|
| Organisation | Government of Odisha |
| Tender Id | 2023_CERWI_92223_8 |
|
Reference Number |
Bridge Tender Online RWCSBP-16/2023-24 |
| Tender Fee | 10000 |
| EMD | 6.1 Lakh |
| Tender Value | |
| Place | CCE RW CIRCLE SAMBALPUR |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in |
| Start Date | August 11, 2023 20:30 |
| End Date |
Expired
21/08/2023
Expired 1067 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreTender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of bridge over local nallah at 1st km on baraguda- barapadar (ps) road in the district of nabarangpur under bsy for the year 2022-23
Construction of bridge over local nallah at 1st km on baraguda- barapadar (ps) road in the district of nabarangpur under bsy for the year 2022-23
Read moreConstruction of hl bridge over parpeta nallah at 1st km on bankey to katupali road in the district of sambalpur under bsy for the year 2022-23.
Construction of hl bridge over parpeta nallah at 1st km on bankey to katupali road in the district of sambalpur under bsy for the year 2022-23.
Read moreConstruction of hl bridge over parpeta nallah at 1st km on bankey to katupali road in the district of sambalpur under bsy for the year 2022-23.
Construction of hl bridge over parpeta nallah at 1st km on bankey to katupali road in the district of sambalpur under bsy for the year 2022-23.
Read moreof your Industry type