Tender Details
Particulars | Details |
---|---|
Title |
Shifting Of Existing 3.3 Kv Overhead Line Feeding Power To Nowrozabad West Mine From Subsidence Area To Safe Location And Maintenance Of It In View Of Coming Monsoon 2025 26 Of Nowrozabad Sub Area Of Johilla Area
|
Description |
Shifting Of Existing 3.3 Kv Overhead Line Feeding Power To Nowrozabad West Mine From Subsidence Area To Safe Location And Maintenance Of It In View Of Coming Monsoon 2025 26 Of Nowrozabad Sub Area Of Johilla Area
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_333366_1 |
Reference Number |
SECL/JHL/SO(EM)/24-25/ ET/242547 dt 27.03.2025 |
Tender Fee | 0 |
EMD | 22900 |
Tender Value | |
Place | SO EnM Office Johilla Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345573 |
Start Date | March 27, 2025 20:00 |
End Date |
07/04/2025 ( Expired 38 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tender for supply of equipment / material , design, erection, testing commissioning for shifting of existing 11 kv ht line, lt line and 100 kva sub-station due to proposed construction of mini sectt. at bharmour chowkon the request of hppwd in sect
Tender for supply of equipment / material , design, erection, testing commissioning for shifting of existing 11 kv ht line, lt line and 100 kva sub-station due to proposed construction of mini sectt. at bharmour chowk on the request of hppwd in sec
Read moreEstimate no 233/ngp/2025 26 shifting of existing dtc, ht and lt oh line transformer ug cable feeder pillar due to widening of road from shivaji square to sadguru prem seva ashram under district nagpur .
Estimate no 233/ngp/2025 26 shifting of existing dtc, ht and lt oh line transformer ug cable feeder pillar due to widening of road from shivaji square to sadguru prem seva ashram under district nagpur .
Read moreThe dismantling and erection of poles for as and when required overhead ht and lt works in the mine lease hold of giridih oc mine until monsoon end period 2025-26, giridih project, giridih area
The dismantling and erection of poles for as and when required overhead ht and lt works in the mine lease hold of giridih oc mine until monsoon end period 2025-26, giridih project, giridih area
Read moreThe work of overhead line maintenance, shifting, realigning etc on as and when required basis during the period till upcoming monsoons in kabribab mine, giridih project, giridih area (under monsoon action plan 25)
The work of overhead line maintenance, shifting, realigning etc on as and when required basis during the period till upcoming monsoons in kabribab mine, giridih project, giridih area (under monsoon action plan 25)
Read moreRepair/maintenance of 3.3kv oh line feeder no 01,02 and 03 from kalyani substation to sdocm mine area in r/o sdocm project of dhori area against approved monsoon activity 2025.
Repair/maintenance of 3.3kv oh line feeder no 01,02 and 03 from kalyani substation to sdocm mine area in r/o sdocm project of dhori area against approved monsoon activity 2025.
Read moreRearrangement and maintenance of 11kv overhead line from kdh old substation to rohini substation to ensure uninterrupted 11kv power supply during monsoon under rohini ocp, nk area
Rearrangement and maintenance of 11kv overhead line from kdh old substation to rohini substation to ensure uninterrupted 11kv power supply during monsoon under rohini ocp, nk area
Read moreMtc and repairing of pipe line, hydrant post, platform, sluice valve chamber of existing dtw schemes at jalefa-betaga sector of satchand r.d block area within the sabroom sub-division of during 2025-26.(gr-i)
Mtc and repairing of pipe line, hydrant post, platform, sluice valve chamber of existing dtw schemes at jalefa-betaga sector of satchand r.d block area within the sabroom sub-division of during 2025-26.(gr-i)
Read moreRepair and maintenance of 3.3 kv overhead line for separate dedicated power supply from cro substation to borehole 43 and tapping point to borehole 24 under churi ug project, nk area
Repair and maintenance of 3.3 kv overhead line for separate dedicated power supply from cro substation to borehole 43 and tapping point to borehole 24 under churi ug project, nk area
Read moreExcavation of drains desilting and cleaning of existing drains during monsoon-2025 at ghonsa oc mine of ghonsa sub area
Excavation of drains desilting and cleaning of existing drains during monsoon-2025 at ghonsa oc mine of ghonsa sub area
Read moreErection of 3.3 kv overhead line from main substation to west substation at jhingurda project
Erection of 3.3 kv overhead line from main substation to west substation at jhingurda project
Read moreof your Industry type