Tender Details

Particulars Details
Title
Erection And Dismantling Of 440 V Oh Line From Jawahar Nagar Substation To Bonar Dhauda Colony Under Bhurkunda Colliery.
Description
Erection And Dismantling Of 440 V Oh Line From Jawahar Nagar Substation To Bonar Dhauda Colony Under Bhurkunda Colliery.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_337592_1
Reference
Number
PE(EnM)/BHK/e Tender/25-26/11
Tender Fee 0
EMD 6800
Tender Value
Place Office Of Project Engineer EnM Bhurkunda Colliery
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=349966
Start Date June 14, 2025 23:30
End Date

25/06/2025 ( Expired 13 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Sitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.

Sitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.

Read more
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)

Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)

Read more
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Read more
Consultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti

Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
E tender cum e auction for allotment of land parcel and assets 1.5 ha. (plot no. f-5) on fresh long term lease basis of 30 yrs under pglm 2015 (and clarifications issued by mopsw from time to time till 10.12.2024) for liquid storage facilities at jnp

E tender cum e auction for allotment of land parcel and assets 1.5 ha. (plot no. f-5) on fresh long term lease basis of 30 yrs under pglm 2015 (and clarifications issued by mopsw from time to time till 10.12.2024) for liquid storage facilities at jnp

Read more
Construction of c.c. road from shiv maharaj to rajput house and rajaram rajak house to mani shrivastava house in ward no. 09, nagar parishad, tendukheda

Construction of c.c. road from shiv maharaj to rajput house and rajaram rajak house to mani shrivastava house in ward no. 09, nagar parishad, tendukheda

Read more
Construction of c.c. road from mukesh paliwal house to sanjay upadhyay house and shamim kuraishi house to ghanshyam sahu in ward no. 09, nagar parishad, tendukheda

Construction of c.c. road from mukesh paliwal house to sanjay upadhyay house and shamim kuraishi house to ghanshyam sahu in ward no. 09, nagar parishad, tendukheda

Read more
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(

Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise