Tender Details

Particulars Details
Title
Widening Of Existing 2 Laning Stretch Road In Available Width For Safety Drainage Segregation Of Traffic In Phaltan City Start Ch. 138 250 At Bypass Start Point To End Ch. 144 425 And Construction New Rob At Km 179 730 Existing Km 61 100 Of Nh 965
Description
Widening Of Existing 2 Laning Stretch Road In Available Width For Safety Drainage Segregation Of Traffic In Phaltan City Start Ch. 138 250 At Bypass Start Point To End Ch. 144 425 And Construction New Rob At Km 179 730 Existing Km 61 100 Of Nh 965
Organisation National Highways Authority of India | RO-Mumbai - NHAI
Tender Id Login to view
Reference
Number
Login to view
Tender Fee 10000
EMD 84.52 Lakh
Tender Value 84.52 Crore
Place
Link Login to view
Start Date April 02, 2026 23:30
End Date
Open 22/10/2026

9 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Upgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.

Upgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.

Read more
4l of jagtial karimnagar section of nh 563 from jagtial bypass start at design ch.0.000 existing chainage 90.500 on nh63 to design ch.58.866 km near sh-1 ch. 170.400 km at karimnagar bypass end dl 58.866 km in the state of telangana on dbfot mode

4l of jagtial karimnagar section of nh 563 from jagtial bypass start at design ch.0.000 existing chainage 90.500 on nh63 to design ch.58.866 km near sh-1 ch. 170.400 km at karimnagar bypass end dl 58.866 km in the state of telangana on dbfot mode

Read more
Widening of existing road 2 laning stretch into 4 lane configuration in phaltan city ch 138 250 to ch 144 425 and construction of new rob at km 179 730 existing km 61 100 of nh 965 in the state of maharashtra

Widening of existing road 2 laning stretch into 4 lane configuration in phaltan city ch 138 250 to ch 144 425 and construction of new rob at km 179 730 existing km 61 100 of nh 965 in the state of maharashtra

Read more
Ieservices for 4 laning of existing 2 laning stretch from dive ghat at km220.900 to hadapsar at km 234.150 (pkg-6) on mohol-alandi section (design length 13.25 km) of nh-965 in maharashtra on ham under nh (o)

Ieservices for 4 laning of existing 2 laning stretch from dive ghat at km220.900 to hadapsar at km 234.150 (pkg-6) on mohol-alandi section (design length 13.25 km) of nh-965 in maharashtra on ham under nh (o)

Read more
4-laning of existing 2-laning stretch from dive ghat at km 220.900 to hadapsar at km 234.150 (pkg-6) on mohol-alandi section (design length 13.25 km) of nh-965 in the state of maharashtra on ham under nh (o)

4-laning of existing 2-laning stretch from dive ghat at km 220.900 to hadapsar at km 234.150 (pkg-6) on mohol-alandi section (design length 13.25 km) of nh-965 in the state of maharashtra on ham under nh (o)

Read more
Ie services during om period for the project of four laning of harda to temagav section from design ch. 0.000 existing ch. 141.750 to design ch. 30.000 existing ch. 180.500 and chicholi existing ch. km 235.800 design ch km 81.000 to betul existing ch

Ie services during om period for the project of four laning of harda to temagav section from design ch. 0.000 existing ch. 141.750 to design ch. 30.000 existing ch. 180.500 and chicholi existing ch. km 235.800 design ch km 81.000 to betul existing

Read more
4-laning of jagtial karimnagar section of nh-563 from jagtial bypass start at design ch. 0.000 (existing chainage 90/500 on nh-63) to design ch.28.000 (existing chainage 23/350 on nh-563) neargangadhara (dl 28.000 km) under nh(o) on ham in telangana

4-laning of jagtial karimnagar section of nh-563 from jagtial bypass start at design ch. 0.000 (existing chainage 90/500 on nh-63) to design ch.28.000 (existing chainage 23/350 on nh-563) neargangadhara (dl 28.000 km) under nh(o) on ham in telangana

Read more
Rectification works at risk and cost of contractor in project balance work of four laning of muzaffarnagar- haridwar section of nh-58 from muzaffarnagar to start of roorkee bypass design ch. 130.360 to ch. 167.200

Rectification works at risk and cost of contractor in project balance work of four laning of muzaffarnagar- haridwar section of nh-58 from muzaffarnagar to start of roorkee bypass design ch. 130.360 to ch. 167.200 in the state of uttar pradesh and ut

Read more
Operation and maintenance of four laning stretch of nh 709b from epe crossing design ch. 0.000 to the of shamli bypass design ch. 61.409 on performance based maintenance contract mode in the state of uttar pradesh

Operation and maintenance of four laning stretch of nh 709b from epe crossing design ch. 0.000 to the of shamli bypass design ch. 61.409 on performance based maintenance contract mode in the state of uttar pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise